• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Reducering av ledtider samt framtagande av kalkylmodell / Reducing lead times and developing a calculation scheme

Birgersson, Marcus January 2008 (has links)
<p>Rimaster Kisa AB is a member of the Rimaster Group, the corporation was bought from Samhall AB in January 2007. The corporation is producing mechanichs needed by the Rimaster group as well for external costumers. Samhall AB is now functioning as a provider of labor for Rimaster Kisa, as the company is hiring personnel from Samhall AB. The company has earlier have had problems with their lead times being far too long. This has resulted in that the management decided to invest in a new edging press. Areas of work included in this thesis are, Investigating the investment of an edging machine, implementing of 5S and a new model of calculating prices of articles. The goal with the report is to reduce the corporations lead times.</p><p>To reduce lead times the company has started working with 5S. This reports presents protocols to aid the employee responsible for the 5S work of the factory. The model for calculating prices is based on a model used by Rimaster Polen. The model has been modified for the needs of the factory in Kisa. The model calculates with parameters for the potential production capability, using this leads to a margin of error with prices higher than needed to be. The company should always be aware of this margin of error so that they do not loose clients because of it. When using this model the company protects themselves for the future. They are not as dependent of the cheap labor gained by Samhall AB. The model calculates cost factors ready to be implemented in the MRP-system, prices are then calculated with the MRP-system.</p><p><strong>Conclusion:</strong> The company should accept the offer made by Amada Implement the model for calculating prices fully, but be aware of its margin of error. Continue the work with 5S that has already been started. </p> / <p>Rimaster Kisa AB ingår i Rimastergruppen, Företaget köptes ifrån Samhall AB i Januari 2007. Samhall AB agerar nu som ett bemanningsföretag och hyr ut sin personal till Rimaster Kisa AB. Anläggningen i Kisa tillverkar mekanik till övriga företag inom koncernen samt externa kunder. Företaget har tidigare haft problem med långa ledtider, detta har resulterat i att ledningen har beslutat i att investera i en ny kantpress. Företaget har även haft problem med att kalkylera sina priser till kund. I rapporten behandlas investeringen av kantpress, framtida investering av stans, ett inledande arbete med 5S samt ett sätt för företaget att visualisera infasningen av nya artiklar i produktionen detta för att sänka de långa ledtider som företaget hittills har haft. Även ett nytt kalkylsystem har införts för att säkerställa att kunder offereras rätt pris.</p><p>Huvudsakligen har två offerter studerats och ställts mot varandra. Den ena offererades av din Maskin och den andra av Amada. Din Maskin har offererat en servostyrd kantpress vilket ses som en ännu ej färdigutvecklad teknik till skillnad mot den mer konventionella hydraulstyrda kantpressen som Amada har offererat. Skillnaden i pris är marginell även om kantpressen offererad av Amada var något billigare på grund av möjligheten att leasa den på sju år. Den stora skillnaden mellan maskinerna låg dock i mjukvaran. Amada offererar en helintegrerad databaslösning, som säkerställer att det hela tiden finns en unik ritning till varje artikel. En ändring för en maskin slår igenom för samtliga i produktionskedjan. Vilket minimerar risken för beredningsmisstag. Då underleverantör av stansning använder sig av en stans ifrån Amada så underlättar investeringen beredningen för såväl underleverantör som för Rimaster Kisa AB.</p><p>Det 5S arbete som inletts består av formulär med frågor för de olika produktionsgrupperna. Formuläret är en vägledning för vad den 5S ansvariga på företaget bör uppmärksamma när den utför sitt uppdrag.</p><p>Den kalkylmodell som tagits fram baseras på en kalkylmodell som Rimaster Polen använder sig av. Den är sedan anpassats så att den passar Rimaster Kisa AB. Den slutgiltiga kalkylmodellen baseras på den potentiella produktionen som Rimaster Kisa är förmögna att producera. Detta lämnar en felmarginal som kan leda till priser som är högre än vad de skulle behöva vara, å andra sidan så garderar sig Rimaster Kisa AB för framtiden. Då man inte kommer vara beroende av att behålla den billigare arbetskraft som företaget idag hyr in via Samhall AB. Kalkylen tar fram kostnadsfaktorer som senare implementeras i Företagets MRP-system. Artiklars pris tas sedan fram med hjälp av beredningstider och dessa kostnadsfaktorer i MRP systemet.</p><p><strong>Företaget råds:</strong> - att acceptera den offert på leasning som Amada har offererat. - Implementera kalkylmodellen som tagits fram, men även vara medvetna om den felmarginal som uppstår. - Fortsätta arbeta med 5S för att minska mängden inventarier och få kortare ledtider.</p>
2

Reducering av ledtider samt framtagande av kalkylmodell / Reducing lead times and developing a calculation scheme

Birgersson, Marcus January 2008 (has links)
Rimaster Kisa AB is a member of the Rimaster Group, the corporation was bought from Samhall AB in January 2007. The corporation is producing mechanichs needed by the Rimaster group as well for external costumers. Samhall AB is now functioning as a provider of labor for Rimaster Kisa, as the company is hiring personnel from Samhall AB. The company has earlier have had problems with their lead times being far too long. This has resulted in that the management decided to invest in a new edging press. Areas of work included in this thesis are, Investigating the investment of an edging machine, implementing of 5S and a new model of calculating prices of articles. The goal with the report is to reduce the corporations lead times. To reduce lead times the company has started working with 5S. This reports presents protocols to aid the employee responsible for the 5S work of the factory. The model for calculating prices is based on a model used by Rimaster Polen. The model has been modified for the needs of the factory in Kisa. The model calculates with parameters for the potential production capability, using this leads to a margin of error with prices higher than needed to be. The company should always be aware of this margin of error so that they do not loose clients because of it. When using this model the company protects themselves for the future. They are not as dependent of the cheap labor gained by Samhall AB. The model calculates cost factors ready to be implemented in the MRP-system, prices are then calculated with the MRP-system. Conclusion: The company should accept the offer made by Amada Implement the model for calculating prices fully, but be aware of its margin of error. Continue the work with 5S that has already been started. / Rimaster Kisa AB ingår i Rimastergruppen, Företaget köptes ifrån Samhall AB i Januari 2007. Samhall AB agerar nu som ett bemanningsföretag och hyr ut sin personal till Rimaster Kisa AB. Anläggningen i Kisa tillverkar mekanik till övriga företag inom koncernen samt externa kunder. Företaget har tidigare haft problem med långa ledtider, detta har resulterat i att ledningen har beslutat i att investera i en ny kantpress. Företaget har även haft problem med att kalkylera sina priser till kund. I rapporten behandlas investeringen av kantpress, framtida investering av stans, ett inledande arbete med 5S samt ett sätt för företaget att visualisera infasningen av nya artiklar i produktionen detta för att sänka de långa ledtider som företaget hittills har haft. Även ett nytt kalkylsystem har införts för att säkerställa att kunder offereras rätt pris. Huvudsakligen har två offerter studerats och ställts mot varandra. Den ena offererades av din Maskin och den andra av Amada. Din Maskin har offererat en servostyrd kantpress vilket ses som en ännu ej färdigutvecklad teknik till skillnad mot den mer konventionella hydraulstyrda kantpressen som Amada har offererat. Skillnaden i pris är marginell även om kantpressen offererad av Amada var något billigare på grund av möjligheten att leasa den på sju år. Den stora skillnaden mellan maskinerna låg dock i mjukvaran. Amada offererar en helintegrerad databaslösning, som säkerställer att det hela tiden finns en unik ritning till varje artikel. En ändring för en maskin slår igenom för samtliga i produktionskedjan. Vilket minimerar risken för beredningsmisstag. Då underleverantör av stansning använder sig av en stans ifrån Amada så underlättar investeringen beredningen för såväl underleverantör som för Rimaster Kisa AB. Det 5S arbete som inletts består av formulär med frågor för de olika produktionsgrupperna. Formuläret är en vägledning för vad den 5S ansvariga på företaget bör uppmärksamma när den utför sitt uppdrag. Den kalkylmodell som tagits fram baseras på en kalkylmodell som Rimaster Polen använder sig av. Den är sedan anpassats så att den passar Rimaster Kisa AB. Den slutgiltiga kalkylmodellen baseras på den potentiella produktionen som Rimaster Kisa är förmögna att producera. Detta lämnar en felmarginal som kan leda till priser som är högre än vad de skulle behöva vara, å andra sidan så garderar sig Rimaster Kisa AB för framtiden. Då man inte kommer vara beroende av att behålla den billigare arbetskraft som företaget idag hyr in via Samhall AB. Kalkylen tar fram kostnadsfaktorer som senare implementeras i Företagets MRP-system. Artiklars pris tas sedan fram med hjälp av beredningstider och dessa kostnadsfaktorer i MRP systemet. Företaget råds: - att acceptera den offert på leasning som Amada har offererat. - Implementera kalkylmodellen som tagits fram, men även vara medvetna om den felmarginal som uppstår. - Fortsätta arbeta med 5S för att minska mängden inventarier och få kortare ledtider.

Page generated in 0.0548 seconds