• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 34
  • Tagged with
  • 34
  • 31
  • 28
  • 28
  • 27
  • 27
  • 24
  • 21
  • 20
  • 19
  • 18
  • 17
  • 17
  • 16
  • 15
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
31

Dálniční most přes široké údolí / Highway bridge over wide wally

Mertová, Eliška January 2017 (has links)
The aim of this diploma thesis was the design of three possible variants, how to span the wide and deep valley with a bridge. After an evaluation, situation of the highway on the only wide load-bearing structure which is constituted by a box girder with transverse cantilevers supported by prefabricated bar braces, was chosen as an optimal solving. The load- bearing structure made of post- tensioned concrete is going to be incrementally launched and be supported by one-column pillars along an axis of the motorway. The work is composed of a detailed design of this preferred variant, which is processed according to the ultimate and serviceability limit state including the construction stage analysis of the bridge by the construction technology by an incremental launching method.
32

Dálniční estakáda přes široké údolí / Highway multispan bridge over wide wally

Bobek, Lukáš January 2017 (has links)
The aim of this diploma thesis is to design and assess highway bridge. The structure is located on the D1 motorway section bridging a wide valley between the Slovak villages Doľany a Klčov. Three variants have been created – box girder bridge with transverse overhangs, a pair of girder bridge and a pair of box girder bridges. The various proposals were compared with each other. For the most valuable option is selected prestressed box girder bridge with transverse overhangs, which are supported by prefabricated concrete struts. The selected proposal was subsequently elaborated in detail, the load-bearing structure is analyzed using Scia Engineer 16. In calculating the internal forces is adjusted for the effects of construction methods, even as time-dependent analysis TDA. When designing the load-bearing structure it is considered the action of permanent load, also loading from transport and temperature. The structure is assessed for serviceability and ultimate limit states according to current standards. The bridge deck is built by incremental launching method. The principle of this method consists of building the segments in a casting yard located behind the bridge abutment. Each segment is matchcast against the previous one and prestressed to the section of structure already built. The whole superstructure is then jacked forward a distance equal to the length of this segment. This process is repeated until the bridge deck is in its final position. Chosen method of construction is very fast and efficient, to the country in the valley isn´t damage during construction.
33

Lávka přes Labe / Footbridge across the Labe

Krč, Rostislav January 2017 (has links)
The thesis focuses on design of prestressed concrete footbridge which passes pedestrian and bicycle path over the Elbe river near city of Celakovice in the Czech Republic. Three different bridge options were analyzed and for further development a cable-stayed footbridge was chosen. Its bridge deck is formed of a box girder supported by cables in its vertical axis and all cable stays are anchored into two concrete A-shaped pylons. This structure was analyzed in SCIA Engineer and assessment of serviceability limit states and ultimate limit states according to recent European standards (Eurocodes) was made. Both the global structural behavior and the local structural integrity of box cross-section were assessed as well as construction stages and cross-sections of pylons and cable stays. Assessments were performed in IDEA StatiCa combined with hand calculations. Eventually a dynamic response of structure was analyzed. Natural modes and frequencies were found and forced oscillation response was evaluated. The thesis includes technical drawings, construction process and visualization.
34

Dálniční vícepolový most / Multi-span highway bridge

Doležal, Lukáš January 2022 (has links)
The subject of diploma thesis is designing multi-span highway bridge over Řepovský potok valley, dirt roads and biocorridor. Three variants of bridge were designed and one of them – box girder 10 span bridge, has been chosen. Bridge deck is made from cast in place post tension prestressed beam. Load-bearing structure is concreting step by step on fixed and moving support. Total length of bridge is 560 m. The analysis of structure was projected on several computational models. They have been made in software Midas Civil and SCIA Engineer 18.1. The assessments of ultimate limit state and serviceability limit state were made in all steps of building in longitudinal and cross direction. In the analysis in longitudinal direction is included the time dependent analysis. Structural design was made in software MS Excel according to valid standards. Finally, drawing documentation and visualization were made.

Page generated in 0.0274 seconds