• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

The Framework of a Multi-Level Database of Highway Construction Performance Times

Williams, Robert Charles 26 May 2006 (has links)
Accurate and reasonable contract time is important to all aspects of a highway construction project. Unreasonably short contract times can raise the bid price, restrict qualified bidders from submitting bids, reduce the quality of the work, and increase the potential for legal disputes. Conversely, unreasonably long contract times encourage less qualified contractors to submit a bid and are a general inconvenience to the traveling public. The Federal Highway Administration (FHWA) recognizes this, and has recommended that all state highway agencies develop a standardized method for estimating contract performance time. To date, the Virginia Department of Transportation (VDOT) does not have an established method. One major portion of this work is the development of the framework for a multi-level time estimating system to aid in the establishment of contract performance times. This system parallels the VDOT cost estimating process, refining estimates as design details become available along the Project Development Concurrent Engineering Process (PDCEP). Three distinct stages exist along the PDCEP that will facilitate the use of a tool for estimating contract time. Sufficient information to begin the conceptual estimate is known as the project enters the six year plan. The parametric estimate may commence as the project enters the scoping phase. Finally, details for the pre-advertisement time estimate are available upon project field inspection. The second major component of this work, the pre-advertisement estimating database system (BIDDS – Bid Item Duration Data System) was constructed during this work. BIDDS uses project information and characteristics to filter through historical performance time data, returning production data from similar projects. Production data is returned at the bid item level to assist in the estimation of production rates, for calculating activity durations. / Master of Science
2

Řízení dodávky vody v rodinném domě / Control of water supply for a house

Chvátal, Michal January 2021 (has links)
The diploma thesis deals with the design and implementation of the system that will control the water supply for the family house and its garden. The system aslo allows you to store a history that can be viewed via the web interface. The web interface also allows you to set system parameters and monitor the current status.

Page generated in 0.0721 seconds