1 |
Product scheduling for the makespan problem with sequence dependent setup timesCura, Boris January 1993 (has links)
No description available.
|
2 |
Tractability and approximability for subclasses of the makespan problem on unrelated parallel machinesPage, Daniel 19 August 2014 (has links)
Let there be m parallel machines and n jobs to be scheduled non-preemptively. A job j scheduled on machine i takes p_{i,j} time units to complete, where 1 ≤ i ≤ m and 1 ≤ j ≤ n. For a given schedule, the makespan is the completion time of a machine that finishes last. The goal is to produce a schedule of all n jobs with minimum makespan. This is known as the makespan problem on unrelated parallel machines (UPMs), denoted as R||C_{max}. In this thesis, we focus on subclasses of R||C_{max}. Our research consists of two components. First, a survey of theoretic results for R||C_{max} with a focus on approximation algorithms is presented. Second, we present exact polynomial-time algorithms and approximation algorithms for some subclasses of R||C_{max}. For instance, we present k-approximation algorithms on par with or better than the best known for certain subclasses of R||C_{max}.
|
Page generated in 0.0593 seconds