21 |
Dalniční most u Soběslavi - příprava, realizace a řízení stavby / Highway bridge at Soběslav - preparation, implementation and project managementTopinka, Jiří January 2015 (has links)
Master´s thesis processes Construction technology project and implementation of bridge at Soběslav on the route D3, section D3 Tábor – Veselí nad Lužnicí, concretely SO 7-216 Bridge over the route III/15527, Černovický stream and biocorridor km 94,100. This is a permanent road bridge about 25 fields with the continuous construction of precast prestressed concrete beams longitudinally coupled concrete slab.
|
Page generated in 0.0714 seconds