Förbättring av nätstruktur i området Forshälla. / Improvement of the power grid structure in the Forshälla area

Dafgård, Anton, Junhav Land, Hugo January 2023 (has links)
När mycket nybyggnation uppstår i ett område behöver nätstrukturen analyseras för att säkerställa att den befintlig strukturen klarar av det nya effektbehovet. I Forshälla byggs sommarstugor om till permanentboende, nya bostadsområden byggs längst med kusten och hushåll monterar solceller och elbilsladdare på deras hus. I detta examensarbete kommer 10 kV-nätet för området Forshälla analyseras och ett förslag kommer tas fram för förbättringar av nätstrukturen. Fördelningsstationen för Forshälla får sex nya kopplingsfack vilket leder till fler omkopplingsmöjligheter i området. Kabel med area 50/95 mm2 byts ut mot 150 mm2 kabel för att säkerställa en stabil och tillförlitlig elförsörjning för kunderna. I dagsläget har Forshälla-området 2447 kunder fördelade på 1889 kopplingspunkter, där 843 av kunderna är bosatta i tätort och 1604 personer på landsbygd. Inom området finns totalt 128 nätstationer, 116,5 km 10 kV-nät och 265,8 km 0,4 kV-nät. Vid framtagning av resultat och metod tillämpas energiföretagens projektering- och beredningshandbok för att planera och strukturera arbetet på ett så effektivt sätt som möjligt. Förslaget till ny nätstruktur består av 19,51 km ny kabel där 3,5 km är utbytt luftledning och resterande utbytt markkabel. Två av de sex nya kopplingsfacken i fördelningsstationen används för att jämna ut belastningsströmmar och skapa fler omkopplingsmöjligheter i nätet. Fem kabelskåp raseras och sju nya nät- och seriesatellitstationer byggs. Det maximala spänningsfallet minskar från 5,50 % till 3,30 % under normal drift. Den totala kostnaden för förslaget till ny nätstruktur blir cirka 7,7 Mkr. Beräkningar gällande långsamma spänningsändringar som uppstår vid inkoppling av solceller uppfyller de krav på ±10 % som ställs av EIFS 2013:1. Ledningsimpedanser för solcellsanläggningarna försummades vid beräkningar vilket kan få det verkliga värdet att skilja sig något från de resultaten presenterade i rapporten. / When a lot of new construction occurs in an area, the power grid structure must be analyzed to ensure that the existing network can handle the new power demand. In Forshälla, summer cottages have been converted into permanent residences, new residential areas have been built along the coast, and households are installing solar panels and electric vehicle chargers in their homes. In this thesis, the 10 kV power grid for the Forshälla area will be analyzed, and a proposal will be developed for improvements to the power grid structure. The Forshälla distribution station will receives six new switching compartments, which will lead to more switching options in the area. Cable with an area of 50/95 mm2 is replaced with 150 mm2 cable to ensure a stable and reliable power supply for customers. Currently, the Forshälla area has 2447 customers distributed over 1889 connection points, with 843 of the customers residing in urban areas and 1604 people in rural areas. There are a total of 128 substations, 116,5 km of 10 kV medium voltage cable, and 265,8 km of 0,4 kV power cable within the area. In the development of results and methodology, the energy companies planning, and preparation handbook has been used to plan and structure the work as efficiently as possible. The authors proposal for the new power grid structure includes laying 19,36 km of new medium voltage cable, of which 3,5 km is replaced power lines and the remaining is replaced underground cable. Two of the six new switching compartments in the distribution station are used to balance load currents and create more switching options in the network. Five junction boxes have been demolished, five network and two series satellite stations will be built. The maximum voltage drop decreases from 5,50 % to 3,30 % during normal operation. The total cost for the proposed new power grid structure is approximately 7,7 Mkr. Calculations regarding slow voltage changes that occur when connecting solar cells meet the requirements of ±10 % imposed by EIFS 2013:1. Conductor impedances for the solar power systems were neglected in the calculations, which may cause the actual value to deviate slightly from the results presented in the report.