1 |
Concurrent Supply Chain Network & Manufacturing Systems Design Under Uncertain ParametersErenay, Bulent 08 July 2016 (has links)
No description available.
|
2 |
Operator Assignment in Labor Intensive Cells Considering Operation Time Based Skill Levels, Learning and ForgettingTummaluri, Raghuram R. 08 December 2005 (has links)
No description available.
|
Page generated in 0.1026 seconds