• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 10
  • 3
  • 2
  • 1
  • 1
  • Tagged with
  • 18
  • 11
  • 8
  • 8
  • 7
  • 7
  • 7
  • 7
  • 6
  • 6
  • 6
  • 6
  • 6
  • 6
  • 6
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Výrobní hala LD Seating - stavebně technologický projekt / LD Seating production hall - construction technology project

Jůzl, Martin January 2018 (has links)
The aim of the diploma thesis is a building-technological project on the production and assembly hall LD Seating in Boskovice u Brna. The solution is influenced by the existing hall in the area of the investor, where there will be a future new building. Based on this fact, the appropriate measures are chosen. The project puts emphasis on the off-road transport and the technological process of assembly of the prefabricated reinforced concrete hall, which will be solved from the financial and time point of view. The workflow will be affected by machine assembly, site facilities, and wider transport relationships. The project also solves the concept of the whole issue as a whole. All building objects are taken into account. Based on this, an object schedule and budget are developed.
12

Víceúčelový objekt v Lužici - stavebně technologický projekt / Execution of Multifunctional Building in Lužice - Building Construction Project

Mouka, Jiří January 2018 (has links)
The diploma thesis deals with the solution of the multi-purpose building project in Lužice. This work includes the extended accompanying and summary technical report, the coordination situation of the construction, the technical report of the transport relations and the coordination of the oversized transport, the object time schedule and the financial plan of the construction, the plan for providing the material resources containing the staff balance for the construction of the main building, the time schedule for the assembly of the prefabricated skeleton, technological standard for prefabricated skeleton, design of main building machines and mechanisms including their time commitment, organization of construction of multipurpose building including drawings of construction site equipment, technological regulation for assembling of prefabricated skeleton and for making of reinforced concrete floor, inspection and testing plan for prefabricated skeleton assembly, lifting mechanism, assembly schemes for prefabricated skeleton elements, lifting mechanism verification schemes, item budget prefabricated skeleton chalk and instructions for building use and maintenance.
13

Projekt přípravy a realizace výrobní a skladovací haly v Mniší / Execution of Production and Storage Hall in Mniší

Šilhová, Kristýna January 2018 (has links)
The diploma thesis deals with the realization of a production and storage hall for the engineering industry. Part of the realization of the production hall is the demolition work of the existing agricultural building. The reconstruction of the existing premises of locksmith's workshop and dressing room for employees is also being implemented. For the preparation of this project, the thesis deals with the implementation of the main technological stages, technological plans for demolition work and substructure, transport routes of the main building materials and machines, technical report of the building site, time and financial plan of the construction, security measures especially for demolition works, quality control when drilling a pilot.
14

Příprava a realizace výrobní haly v Hulíně / Implementation of Production Hall in Hulín

Holba, Petr January 2019 (has links)
The topic of the diploma thesis is a solution of the construction and a technological project of a production hall in Hulín. The thesis consists of an accompanying and a summary technical report, a study of the main technological stages implementation, a coordination situation of the construction with the closer transport relations, a solution of wider transport route relationships including a proposal of the building supply and an oversized transport solution, an object time schedule and a financial plan of the construction including the staff balance, a time schedule for the selected processes of the main building object, a design of the main building machines including an assessment of a lifting mechanism, a technological regulation for assembling of a prefabricated skeleton including a health and a safety plan, a technological regulation for a wire-concrete floor realization including a quality control and a health and a safety plan, a project of site equipment, a control and a test plan for prefabricated skeleton assembly. And also a budget item for selected technological processes, an assembly scheme for the prefabricated skeleton and a schemes´composition of the wire-concrete floor.
15

StavebnÄ technologick projekt p­stavby vrobn­ haly / Construction-technological project of the extension of the production hall

M©zl, Petr January 2019 (has links)
This diploma thesis deals with the construction and technological project of the extension of the production hall Granitol a.s. in Moravian Beroun. The thesis focuses on the technological stage of assembly of the prefabricated skeleton of the rough top structure and the laying of the floor formation. In addition, an extended accompanying and summary technical report, a technical report on transport relations and coordination of oversized transport, a time and financial plan for the construction, a budget for the prefabricated skeleton, a timetable and the balance of the workers, the design of the main construction machines and mechanisms, including their time commitment , organization of the construction of the building including drawings of the construction site equipment, technological regulation for the assembly of the prefabricated skeleton and the laying of the floor formation, inspection and testing plan for the prefabricated skeleton assembly, summary assessment of the lifting mechanism selection, schematic of the assembly procedure of the prefabricated skeleton elements, protection and health at work during construction.
16

Stavebně technologický projekt haly ADS s.r.o. Větřkovice / Building Construction Project - Implementation of Production Hall ADS s.r.o. Větřkovice

Ráb, Jakub January 2019 (has links)
The subject of my master's thesis is construction technological project of the hall ADS s.r.o. Větřkovice. The work includes technical report of construction technological project, facilities of construction zone, solving traffic routes from the production to the place of construction, study of the implementation of the main technological stages of the building SO02, the most appropriate machine assembly, technological specification for drilled piles and for montage of prefabricated reinforced concrete skeleton, control and test plan, schedule of work, itemized budget, plan of the safety and health protection during work, proposals of design of movement mechanisms and time and financial discretion of realization of the reinforced areas of the production hall area.
17

Výstavba haly Karusel - stavebně technnologický projekt / Construction of the hall Carousel - construction technology project

Urbánek, Lukáš January 2017 (has links)
This master's thesis aims to create a construction technological project for the construction of production halls of the company Beton Brož s.r.o. The content reveals solution to transport oversized steel construction elements, equipment of construction zone, technological prescription for micropiles including quality control of performed work, ensuring safety and health protection at work, schedule and budget of the main building and draft of contract for work.
18

Realizace výstavby Hotelu Karpaty ve Valašských Kloboukách / Construction of the Hotel Karpaty in Valašské Klobouky

Šánek, Adam January 2022 (has links)
The subject of my diploma thesis is the solution of the construction of the Hotel Karpaty located near the town of Valašské Klobouky. The thesis contains an accompanying technical report, solution of transport routes, including traffic situation, time and financial plan of construction, study of implementation of main technological stages, construction site project with division into individual stages, drawing part and construction site report, design of main working machines and mechanisms, time hotel construction plan, plan for securing material resources, including budget and staff needs chart, technological regulation of monolithic ceiling structures, control and test plan for monolithic ceiling structures, design and installation of Schüco aluminum windows, design of construction measures Hotel Karpaty according to LEED standard.

Page generated in 0.0446 seconds