Spelling suggestions: "subject:"matka"" "subject:"jotka""
21 |
Sportovní hala / Sports hallHorká, Petra January 2012 (has links)
The goal of this master´s thesis is to design load bearing structure of a sports hall. The thesis is elaborated in two variants of the structure design of the sports hall for common types of sports (handball, footsal, tennis, volleyball, basketball). The ground plan dimension is 42 to 72 meters and the construction height is 8 meters. The construction is designed for the district of Brno city. In the structural anlysis there were the following main load bearing structural elements designed and examined: glue laminated timber truss, wood purlins, steel beams, rods and bracing, columns, which together with the transverse girders are linked and foot and anchoring. The selected variant is also further developed. Part of the work is drawing documentation of the choosen variant, disposition drawing and drawings of the selected details.
|
22 |
Sportovní hala v Písku / Sport hall in PísekDružbík, Jiří January 2012 (has links)
The theme of the master’s thesis is to design steel structures sports hall. The proposal is developed in three variants according to ČSN EN. The work addresses the static effect of the steel structure and design of parts and materials design. Plan dimensions are 60x38m, max. internal height is 9,3m. The structure is designed for ultimate limit states and serviceability. The supporting structure is designed as roof arches surround an elliptical girder. In both gable walls are designed steel columns. The work also details and solution design. Sports hall was solved in Scia Engineer 2011 and includes a drawing documentation.
|
23 |
Výstavní pavilon v Olomouci / The exhibition hall in OlomoucĆmiel, Jiří January 2013 (has links)
Master's thesis includes designing of exhibition pavilon on a circular platform with a diameter of 35m. The pavilon is designed as a schwedler circular dome. The construction is designed as a ball and is made of tubes. Pavilon includes designing of floors and stairs bearing system that is also made of steel.
|
24 |
Vinařské centrum Šidleny / Wine center ŠidlenyNeduchal, Tomáš January 2013 (has links)
This thesis addresses the detailed design new buildings Wine Centre. The building is detached, three-storey, with a gable roof. Vertical and horizontal brick ceiling are from Heluz. The construction is based on monolithic footings and footings. The roof structure consists of trusses with burnt roof covering. Around the house there are parking spaces for cars.
|
25 |
Návrh ŽB konstrukcí dle EC 2 a ACI 318 / Reinforced concrete structure design in accordance with EC 2 and ACI 318Tesárková, Václava January 2013 (has links)
This work deals with the analysis of reinforced concrete structures according to the currently valid standard EN 1992-1-1 (EC 2) compared with the analysis according to the American standard ACI 318-08. Static solution includes an assessment of slab in local supports, calculation of columns and footings according to 1st critical state for both standards. The slab is also assessed according to the 2st critical state according to EC 2.
|
26 |
Administrativní budova / Office BuildingŽák, Jan January 2014 (has links)
The Master’s thesis Office building is compiled in the form of project documentation witch comprises all the requisites required by current regulations. The designed building is placed on the sites numbered 2589/1 in Litomerice. This is a new building withoutbasement with four floors. The house is rectangular in plan, built of precast reinforced concrete frame system with infill masonry and roofing flat roof monotube roofing.
|
27 |
Montovaná hala s administrativní budovou / The prefabricated factory building with office blockKrejčová, Jana January 2014 (has links)
Master´s thesis describes the design and assessment of selected elements concrete factory building with office block, elaboration of shape and reinforcemenet drawings of selected structural prefabricated elements. The work also includes technical report and details of connection elements. Calculation was performed also using a computer program SCIA Engineer and Excel.
|
28 |
Sportovní hala v Prostějově / The Sport Hall in ProstějovHouška, Daniel January 2015 (has links)
The goal of the submitted thesis is a design and assessment of a steel load-bearing structure of a multipurpose sports hall situated in Prostějov. The floor plan measurements of the object are 38x54 m with the maximum ceiling height of 9,5 m. Final design variant was chosen on the basis of two preliminary drafts, both processed according to standard ČSN EN. The structure is designed with respect to ultimate and serviceability limit states. The construction consists of 10 cross-links spaced by 6,0 m. The spatial rigidity of the structure’s main load-bearing system is provided by spatial elliptic trussed girders, longitudinal and sway bracings. Roof cladding is carried by purlins placed on trusses. Steel columns are designed as a part of gable walls. The project was carried out in Scia Engineer 2014 software. Some particular elements were subsequently assessed by means of manual calculation. The thesis also includes assessment of joints, construction details and drawing documentation.
|
29 |
Letištní hala / Airport HallKulichová, Jana January 2015 (has links)
The construction of the concourse is designed from steel.Construction was designed in 2 variants.The construction of the hall is radially curved in plan view with a circular sector on the longitudinal side.Roof structure consists of eight trusses at an axial distance of 9 m.Tracks are arched truss designed as a parallel.Trusses are designed to span 40m.Maximum ground clearance hall at the top is 14 meters.Letištní hala byla řešena v programu Scia Engineer 2014 a součástí je i výkresová dokumentace.
|
30 |
Tělocvična - prefabrikovaný skelet / Gym – Precast concrete frame constructionČihák, Tomáš January 2015 (has links)
This master thesis deals with a draft of precast concrete frame structure on the case of gymnasium building. The major part of this work are transversal and longitudinal frames, consisted of footings, columns, girders and precast floor slab. Other parts of the building are not solved. Thesis consists both static calculations and drawings.
|
Page generated in 0.0438 seconds