• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 49
  • Tagged with
  • 49
  • 36
  • 13
  • 11
  • 11
  • 10
  • 10
  • 9
  • 9
  • 8
  • 8
  • 6
  • 6
  • 6
  • 6
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
41

Výstavní pavilon / Exhibition Pavilion

Shánělová, Lenka January 2014 (has links)
The Master´s thesis contains design of steel construction of exhibition pavilion, which is consists of columns, dome, lantern and suspension footbridge. Building will be intended for organizing exhibitions and conferences by town Trutnov. Two models of variants of dome´s construction are drafted in this work– Schwedler´s and Föpple´s dome. Models are space tubular structures.The work contains static assessment of spatial structures and spherical steel joint in program SCIA Engineer for both variants. Hand assessment of bars, basic details and anchoring, technical report and drawing dokumentation are drafted for selected variant construction with Schwedler´s dome.
42

Kampus MU Brno (zelená etapa) - stavebně technologický projekt / Campus MU Brno (green stage) - construction technological project

Honzík, Roman January 2015 (has links)
The subject of this thesis is the solution of building technology project for the construction of the main processing stages University Campus Bohunice (green stage). It is a building consisting of nine pavilions which are mutually connected by two corridors. Corridors simultaneously combine green building stage with blue previous stage. All buildings are partial basement and three floors. Exceptions are SO IV-309, which consisted of four storeys with casing of an elliptic cylinder with a flat roof in the middle of the roof sheathing. In my thesis I deal specifically this very building object, which I discussed in terms of time, financial, technological progress bored piles and building equipment. Other portions are designed to project the whole building.
43

Nemocnice v Pardubicích - příprava a organizace přístavby pavilonu / Hospital in Pardubice - preparation and organization of extension Pavilion

Záleský, Martin January 2015 (has links)
This thesis discusses the preparation and organization of the extension construction of multi-purpose Pavilion in Pardubice hospital. The thesis contains a summary accompanying technical report, technical regulations for CFA piles and contact insulation system. Those 3 regulations have developed inspection and test plans. Next parts od the work are time schedule and an itemized budget of the pavilion, time and financial plan of the whole building, Occupational safety and health instructions, environmental issues during the construction, design of mechanical set, system of construction site project. There is also noise study made during the implementation of the construction of the pavilion. Finally there is also situation of construction, CFA pilot implementation scheme and contract.
44

Vícepodlažní montovaná konstrukce / Multi-storey precast structure

Polák, Marek January 2016 (has links)
The final thesis is focused on reworking hospital pavilion from cast-in-place structure to precast concrete frame. Calculation of internal forces is made by software system SCIA Engineer. Main load-bearing elements are inner beam, outside beam and all columns in axis 2-C. This thesis contains assembly report, structural design, calculations and drawings of the designed parts, joint details, assembly material drawing and hand calculation.
45

Nový pavilon SOU Písek / New pavilion SOU Písek

Troup, Tomáš January 2017 (has links)
Diploma thesis deals a project documentation of a new school pavilion SOU in the location Pisek because of the unsatisfactory existing school bulding, which is located at a small distance from the new pavilion. Investor wants to build a new object of universal classrooms for ca. 180 students and sports hall with hygienic and technical facilities, which will be able for football club FC Pisek (football fields and central object of FC Pisek are close to neighboring plots). Investor wants to let the school canteen be on the current place, which is north of the new object. The object is designed as a two-floor with roof ascent (3.NP terrace), part of the building is embedded in the ground. The structural system of the school object is a ceramic bricks system, structural system of the sports hall is a reinforced concrete system. The roof of school object is warm flat roof and roof of sport hall is warm flat roof as well but mono-pitched type. The object has a U -shaped.
46

Výstava versus výstavnictví. Československé pavilony na Expo 1967 v Montrealu a Expo 1970 v Ósace / Exhibition versus "exhibitioning". The Czechoslovak pavilions at Expo 1967 in Montreal and Expo 1970 in Osaka

Nekvindová, Terezie January 2014 (has links)
The paper focuses on the Czechoslovak pavilions at the 1967 and 1970 World Expos. Both events took place in the period around 1968, when, however briefly, the Czechoslovak visual arts partially overlapped with the state's cultural policy. The pavilions (especially at Expo 70) also reflected the socio- political contexts of the year 1968.. In Czechoslovakia towards the end of the 1960s, the purpose of "exhibitioning" - i.e., the state-sponsored exhibition trade - was to communicate with the public and to (re)present the country abroad. Its main goal was to promote and spread the ruling ideology. On the other hand, the Czechoslovak visual arts scene was beginning to consciously work with the medium of the exhibition as a comprehensively composed unit, either through innovative exhibition design and installation or through installation art. While the exhibition trade reached its high point in the 1960s and began to disintegrate into rigid mannerism towards the end of the decade, real experiments with the format of the art exhibition were just beginning. This study focuses on the question of how these two fields (art and the exhibition trade) approached the medium of the exhibition in the 1960s. I study the Czechoslovak pavilions as a cultural artifact in which aesthetic, social, political, and economic forces...
47

Výstavní pavilon / Exhibition pavilion

Španihel, Jiří January 2012 (has links)
The subject of the diploma thesis is design and examination of supporting steel structure of the exhibition pavilion situated at the Brno Exhibition Centre, including a comparison with the second variant. The design emphasis has been placed on keeping the architectural character of building related to its purpose. The structure consists of 11 sections shaped as elliptical arcs, formed by truss frames with variable length of semi-axes, while the largest size (the smallest) is 13 m (7 m) for minor semi-axis and 20 m (14 m) for the main semi-axis, height is 16 m (10 m) and distance of support 38.92 m (25.30 meters). For the analysis of internal forces has been assembled spatial bar shaped model. Cladding is made of Kalzip system.
48

ZOO STAVBY – HERALDICKÁ ZOO / ZOO BUILDINGS – HERALDIC ZOO

Štancl, Michal January 2015 (has links)
- The aim of the thesis was to further process the selected buildings in the overall urban design animal farm. - Putting the individual buildings into a very rugged terrain and the subsequent harmony with the surrounding landscape - Create attractive objects for future visitor's animal farm - By ensuring the development of the territory
49

Multifunkční pavilon nemocnice v Českém Krumlově - stavebně technologický projekt / Multipurpose Hospital Building in Český Krumlov - Building Technology Project

Mikulášek, Jiří January 2020 (has links)
The diploma thesis is focused on the elaboration of a construction technology project for the construction of a new hospital pavilion in Český Krumlov. The thesis processes the preparation of construction and proposal of the organization of individual activities on the construction site in time sequence. The thesis contains technological regulations for the foundation of construction and realization of the monolithic frame on the 1st floor, which also includes drawings of the formwork of the ceiling slab and a scheme of formwork of columns and walls. Further contents are technological report, technological study of realization, transport relations, time and financial plans, complete construction site equipment for the whole construction phase, design of construction mechanisms and assessment of their suitability for use, resource balance, technological analysis, itemized budget, and occupational health protection for selected processes and noise studies dealing with the impact of building construction on the surrounding development.

Page generated in 0.0267 seconds