• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • Tagged with
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Evaluation of the Performance of Pervious Concrete Pavement in the Canadian Climate

Henderson, Vimy Ina January 2012 (has links)
Pervious concrete pavement has the capacity to perform as two types of infrastructure: a pavement; and a stormwater management solution. It is a low impact development as it does not alter the natural hydrological cycle when implemented, unlike a conventional impermeable pavement. This research represents some of the initial investigations into pervious concrete pavement in Canada. The two research hypotheses of this research were the following: 1. Pervious concrete pavement can be successfully planned, designed, constructed and maintained in Canada for successful performance based on surface evaluations of permeability rate and surface condition. 2. Verification that the subsurface drainage capabilities of pervious concrete pavement are as described in literature and can be quantified using instrumentation. Through monitoring of the design, construction, performance and maintenance of five field sites across Canada and various laboratory pavement slabs, the behaviour of pervious concrete pavement in freeze-thaw conditions has been evaluated. This thesis presents the findings from the various phases of the life cycle of pervious concrete pavement: planning; design; construction; and maintenance. An interpretation of the performance of pervious concrete pavement both from the perspective of the surface and subsurface is included. The various field sites led to pervious concrete being used in areas exposed to static or parked traffic and areas with slow moving traffic. At the two sites that included static and slow moving traffic, the permeability performance was better in the areas of static traffic than those with moving traffic. Each of the field sites had a unique mix design and some had multiple variations of one basic mix design. The relationship between the void content and hardened density of the pervious concrete cores was linear with none of the cores being visually identified as outliers. Substantial deterioration in pavement structure performance was identified at one site. Other field sites showed changes in structural capacity over the monitoring timeline. However, no locations of substantial decreases in structural capacity were identified. The surface condition of the sites over the analysis period indicated that compaction to the surface during construction was helpful in constructing a quality pavement. The results of the project indicated that pervious concrete will crack when joints are not included and may also crack similarly to conventional impermeable concrete pavements if joints are spaced too widely or do not match joints of adjacent pavement. Washing the pervious concrete pavement surface with a large hose or garden hose was found to be the most effective in improving permeability across a site and also in increasing the permeability of the pervious concrete. The initial permeability of the pervious concrete pavement was found to influence future performance. Freeze-thaw cycling and moisture were found to alter the internal structure of pervious concrete. However, did not generally lead to surface distress development. The application of sand as a winter maintenance method decreased the permeability, as did the use of a salt solution. However, neither winter maintenance method led to the permeability rates of laboratory slabs dropping below an acceptable level. All three slabs loaded with a salt solution deteriorated to a point where the slabs had failed. The initial permeability of the field sites proved to be important and although some sites started with what appeared to be very high permeability rates, these sites were successful in the multiple year evaluation in maintaining adequate permeability rates. The types of surface distresses that developed in the cores and slabs in the laboratory were generally not substantially worse at the field sites, suggesting that pedestrian and vehicle traffic do not necessarily escalate distresses caused by the Canadian climate and corresponding winter activities. The subsurface drainage that was quantified by the instrumentation included in three field sites confirmed observations from the surface of the pavement and exceeded other expectations. Two field sites exhibited limited drainage capabilities on the surface of the pervious concrete pavement, one shortly after construction, and the other within a year following construction. The subsurface analysis quantified and confirmed that moisture was not able to drain completely vertically through the pavement structures at these two sites due to the limited access in the pervious concrete pavement surface. In comparison, the subsurface drainage at another site surpassed the assumed behaviour of pervious concrete pavement structures. The pavement structure in general at this site was highly permeable and this was identified as moisture was not observed to be collecting in the bottom of the storage base layer at any time or for any period of time. The successful overall drainage performance of this site demonstrates the ability to effectively use pervious concrete pavement in Canada.
2

Evaluation of the Performance of Pervious Concrete Pavement in the Canadian Climate

Henderson, Vimy Ina January 2012 (has links)
Pervious concrete pavement has the capacity to perform as two types of infrastructure: a pavement; and a stormwater management solution. It is a low impact development as it does not alter the natural hydrological cycle when implemented, unlike a conventional impermeable pavement. This research represents some of the initial investigations into pervious concrete pavement in Canada. The two research hypotheses of this research were the following: 1. Pervious concrete pavement can be successfully planned, designed, constructed and maintained in Canada for successful performance based on surface evaluations of permeability rate and surface condition. 2. Verification that the subsurface drainage capabilities of pervious concrete pavement are as described in literature and can be quantified using instrumentation. Through monitoring of the design, construction, performance and maintenance of five field sites across Canada and various laboratory pavement slabs, the behaviour of pervious concrete pavement in freeze-thaw conditions has been evaluated. This thesis presents the findings from the various phases of the life cycle of pervious concrete pavement: planning; design; construction; and maintenance. An interpretation of the performance of pervious concrete pavement both from the perspective of the surface and subsurface is included. The various field sites led to pervious concrete being used in areas exposed to static or parked traffic and areas with slow moving traffic. At the two sites that included static and slow moving traffic, the permeability performance was better in the areas of static traffic than those with moving traffic. Each of the field sites had a unique mix design and some had multiple variations of one basic mix design. The relationship between the void content and hardened density of the pervious concrete cores was linear with none of the cores being visually identified as outliers. Substantial deterioration in pavement structure performance was identified at one site. Other field sites showed changes in structural capacity over the monitoring timeline. However, no locations of substantial decreases in structural capacity were identified. The surface condition of the sites over the analysis period indicated that compaction to the surface during construction was helpful in constructing a quality pavement. The results of the project indicated that pervious concrete will crack when joints are not included and may also crack similarly to conventional impermeable concrete pavements if joints are spaced too widely or do not match joints of adjacent pavement. Washing the pervious concrete pavement surface with a large hose or garden hose was found to be the most effective in improving permeability across a site and also in increasing the permeability of the pervious concrete. The initial permeability of the pervious concrete pavement was found to influence future performance. Freeze-thaw cycling and moisture were found to alter the internal structure of pervious concrete. However, did not generally lead to surface distress development. The application of sand as a winter maintenance method decreased the permeability, as did the use of a salt solution. However, neither winter maintenance method led to the permeability rates of laboratory slabs dropping below an acceptable level. All three slabs loaded with a salt solution deteriorated to a point where the slabs had failed. The initial permeability of the field sites proved to be important and although some sites started with what appeared to be very high permeability rates, these sites were successful in the multiple year evaluation in maintaining adequate permeability rates. The types of surface distresses that developed in the cores and slabs in the laboratory were generally not substantially worse at the field sites, suggesting that pedestrian and vehicle traffic do not necessarily escalate distresses caused by the Canadian climate and corresponding winter activities. The subsurface drainage that was quantified by the instrumentation included in three field sites confirmed observations from the surface of the pavement and exceeded other expectations. Two field sites exhibited limited drainage capabilities on the surface of the pervious concrete pavement, one shortly after construction, and the other within a year following construction. The subsurface analysis quantified and confirmed that moisture was not able to drain completely vertically through the pavement structures at these two sites due to the limited access in the pervious concrete pavement surface. In comparison, the subsurface drainage at another site surpassed the assumed behaviour of pervious concrete pavement structures. The pavement structure in general at this site was highly permeable and this was identified as moisture was not observed to be collecting in the bottom of the storage base layer at any time or for any period of time. The successful overall drainage performance of this site demonstrates the ability to effectively use pervious concrete pavement in Canada.
3

Анализа примене отпадних и рециклираних материјала за израду порозног бетонског коловоза / Analiza primene otpadnih i recikliranih materijala za izradu poroznog betonskog kolovoza / Analysis of the application of waste and recycled materials for the production of pervious concrete pavements

Šešlija Miloš 24 September 2018 (has links)
<p>У дисертацији су анализиране мешавине за израду порозног бетонског коловоза. Пројектовано је укупно 12 различитих врста мешавина. За справљање бетонских мешавина коришћене су фракције природног и рециклираног агрегата. Електрофилтерски пепео, који је отпадни материјал из термоелектрана, коришћен је као минерални додатак, којим је замењен део цемента. Справљено је шест мешавина са рециклираним агрегатом и шест мешавина са природним агрегатом. Лабораторијска испитивања су обухватила испитивање чврстоће при притиску бетона након: 7, 28, 56 и 84 дана, чврстоће при савијању (након 28, 56 и 84 дана), модул еластичности (статички и динамички), отпорност према хабању, коефицијент водопропустљивости и порозност. Добијени резултати потврдили су постављене хипотезе да је са рециклираним агрегатом и електрофилтерским пепелом могуће пројектовати и извести порозни бетонски коловоз.</p> / <p>U disertaciji su analizirane mešavine za izradu poroznog betonskog kolovoza. Projektovano je ukupno 12 različitih vrsta mešavina. Za spravljanje betonskih mešavina korišćene su frakcije prirodnog i recikliranog agregata. Elektrofilterski pepeo, koji je otpadni materijal iz termoelektrana, korišćen je kao mineralni dodatak, kojim je zamenjen deo cementa. Spravljeno je šest mešavina sa recikliranim agregatom i šest mešavina sa prirodnim agregatom. Laboratorijska ispitivanja su obuhvatila ispitivanje čvrstoće pri pritisku betona nakon: 7, 28, 56 i 84 dana, čvrstoće pri savijanju (nakon 28, 56 i 84 dana), modul elastičnosti (statički i dinamički), otpornost prema habanju, koeficijent vodopropustljivosti i poroznost. Dobijeni rezultati potvrdili su postavljene hipoteze da je sa recikliranim agregatom i elektrofilterskim pepelom moguće projektovati i izvesti porozni betonski kolovoz.</p> / <p>In the dissertation, mixtures for the production of pervious concrete pavements are analyzed. The project has a total of 12 different types of mixtures. For the preparation of concrete mixtures, the fractions of natural and recycled aggregates were used. Fly ash, which is a waste material from thermal power plants, was used as a mineral supplement, which replaced a part of cement. Six mixtures with a recycled aggregate and six mixtures with a natural aggregate were collected. Laboratory tests included: compressive strength after 7, 28, 56 and 84 days, felxural strength (after 28, 56 and 84 days), modulus of elasticity (static and dynamic), abrasion, permeability and porosity. The obtained results confirmed the hypotheses that it is possible to design and execute a previous concrete pavement with a recycled aggregate and fly ash.</p>

Page generated in 0.5487 seconds