Spelling suggestions: "subject:"paperboard"" "subject:"checkerboard""
21 |
Penzion / Apartment hotelPrívara, Marek January 2013 (has links)
The subject of this thesis was to develop project documentation for building construction. It is a new four-storey house with restaurant, situated on the outskirts of the village Bridges at Jablunkova. The building is brick, has a two-level gable and shed roof, consisting of wood roof system. Slope of the parcel on which the house is located, allows the building of the plant into the ground. Because of this it is possible to enter it, either the main entrance to the first floor or building around and over the summer terrace come directly to the restaurant on the second floor. Above it are two more floors for hotel guests only, a total of 10 accommodation units with its own bathroom.
|
22 |
Horský hotel / Mountain hotelVandrovec, Aleš January 2014 (has links)
Master’s thesis theme is mountain hotel project. The hotel has one lower basement and four aboveground floor. It has trditional look and the roof is double-pitched. Floor projection looks like letter "L". Main part has measurements 25,3 x 14,1 m and it has four floor. Extension is on northwest side of main part. It has measuremnts 11,85 x 9,5 m and three floor. Facede of basement and first floor is from stone facing mansory. Facade od second floor of main patr of buildings id timbered looks like curb. Third and fourth floor are attic, gable is vertical timbered. Facade of second floor of extension is plaster on ETICS. The gable od extension is vertical timbered. Roof covering is alpen shingle from larch wood. Foundations of house are shallow. The construction system is walled. The lower basement is built from masonry BS Klatovy BD30 and other wall are from masonry Porotherm . Floor structures are from monolithic reinforced concrete, thickness 220 mm. House stairs are prefabricated double-flight. Partition wall are mostly built from mansory Porotherm 11,5 P+D. Lintols above windows and doors in facadeare made by reverse of floor slab and inside of disposition are made by ceramics lintols Porotherm. Floor structures are floating with impact insulation in whole house. In living rooms wear layers are from oak parquet block and in common rooms, toilets, bathrooms and technical rooms is ceramics paving. Wall’s surfaces are made from patent plaster and in lower basement are made from two-coat work with white coat. Toilets and bathrooms are tilled with ceramic tiles. All distributions of building equipment are covered with gypsum plasterboard ceiling. All windows and doors in facade are made by wooden profile Solid comfort SC78 and glazed by triple glazing unit (Uw,max=0,9 W/m2.K), exception is main entrance door, It is made by aluminum profile and it is automatically opened.
|
23 |
Novostavba farního kostela v Brně-Líšni / Parish church, Brno - LíšeňJurák, Vítězslav January 2015 (has links)
This diploma thesis, called „Parish church, Brno-Líšeň“, is compiled as documentation for building construction. There is one complex building situated in slope. Therefore it consists of one partly underground floor and first floor. It is divided into three sections. Central part is designed as round-shaped body of the church with tower in the southern part of the church. Shed roof has an angle of 7° for body and an angle of 13° for tower. From the western side there is an administrative area connected to the church and from eastern side there is a community area which is supposed to be used as residential premises. Roof of both these parts is constructed as flat vegetative roof. Structural design is systemic, Velox. Foundation construction combines concrete and ferro-concrete belts and footing.
|
24 |
Sportovně relaxační centrum / Sports and wellness centerLibřický, Zdeněk January 2018 (has links)
The final thesis is focused on the design and elaboration of the project documentation of the sports and relaxation center. The proposed building is located in the south-eastern part of the town of Hradec Králové, in a location supposed for buildings and areas of sports and relaxation use. It is a three-storey building with a flat roof and partial basement. The construction system is wall-mounted with a combination of skeleton. The building is based on plain concrete and reinforced concrete foundation footing. The peripheral, supporting and partition walls are designed from ceramic blocks POROTHERM. The inner load-bearing elements consist mainly of reinforced concrete columns. The ceiling structure is designed from reinforced concrete slabs supported locally. The perimeter walls of the first overground floor and part of the perimeter walls of the basement are insulated by an external contact thermal insulation system. The thermal insulation of the perimeter walls of the second floor is designed by means of a ventilated facade with facade tiles except the squash courts and the relaxation area. The building is functionally divided into three main parts, where the central part forms an entrance hall with comunication spaces of all floors. In this part a basement with technical facilities is designed. The right part of the ground floor consists of a restaurant with a bowling alley and a kitchen with storage and hygienic facilities. As part of this section, a gym and exercise rooms for fitness exercises, spinning and TRX are designed on the second floor. The left part consists of two squash courts with the appropriate facilities and massage areas. There is also a relaxing facilities with a north-facing terrace on the second floor. There are also dressing rooms and hygienic facilities. The designed object is accessible for disabled people. There is a parking lot for 40 cars, 3 motorcycles, one bus and three barracks for cars.
|
25 |
Centrální požární stanice Svitavy / Fire station, SvitavyNavrátil, Michal January 2020 (has links)
The diploma thesis elaborates the project documentation for the construction of a new apartment of central fire station type C1 with the administrative part of the Territorial Department. The fire station is technologically linked to the second building SO.02 the technical and technological background of the fire station. The building is situated on the eastern edge of Svitavy. The building is non-cellular, it has three floors and a flat green roof. Three floors fulfilling matter with mainly administrative function is connected with two floors blocks fire station with an indoor gym. Above the floor containing garages for emergency vehicles facilities for the emergency unit are placed with a curtain that creates fading of the emergency door. The matter of the gym is optically separated from the station and highlighted with a volume narrow neck and height elevation. In the station there are training places and places for general physical preparation. The buildings are located in a sloping terrain. The ground fire station has a heliport. The establishment supporting columns of the building are for made of prefabricated calyx, and are concreted into monolithic foundation pads. Infill wall vertical bearing and non-bearing structures are designed from clay blocks type THERM. The bearing system is reinforced concrete prefabricated frame. Horizontally bearing structures are designed from prestressed hollow core slabs. The building envelope is made of a curtain wall in dark grey and red combined with a light contact thermal insulation system used on the indoor gym. The envelopes are in the administrative part and the part of the station divided by a glazed area. In the workshops and technology room the envelope is divided by lamellae. Usually there are 13 firemen during one shift, in three shifts there work 39 firemen all together. There are supposed to be 17 employees in the administrative department.
|
26 |
Rekonstrukce restaurace s nástavbou ubytovacích prostor / Reconstruction of Restaurant with Housing Facilities ExtensionJun, Martin January 2013 (has links)
Diploma thesis "Reconstruction of Restaurant with Housing Facilities Extension" is processed in the form of project documentation for building construction according to the applicable regulations (Act No. 183/2006 Coll., On Zoning and Building Regulations, including subsequent amendments). The project deals with the reconstruction of the existing restaurant building in the village Lísek, No. 89. The building is located on plot No. 49 in the cadastral Lhota u Lisku. Floor plan of the existing building is in rectangular shape with almost the unused basement and a deck above. The 1st underground floor is currently used only technical room and garage. In the 1st floor there is the sales area of restaurant, large kitchen and rooms for staff. Existing structures do not show signs of major damage. Reconstruction is not due to the technical condition of the building, but due to operationally unsatisfactory disposition and investor requiring to create an accommodation capacity. The requirement was to build new rooms to accommodate 24 persons. The supporting structural system of the 2nd floor is designed of ceramic bricks and 3rd floor due to the resistance of existing constructions is newly designed as wooden sandwich. The window openings are fitted with a six-chamber windows with triple insulation. Horizontally extension of the existing building corresponds to the current object. The roof of the building is gabled with dormers lighting the rooms in the 3rd floor. The building is designed so that even after the reconstruction match an existing installation. Part of building construction works is also landscaping. Due to the partial change in purpose of the building was necessary to design a suitable parking space with adequate capacity.
|
27 |
Budova občanské vybavenosti / Civic amenities buildingBaroň, Alexandr Unknown Date (has links)
The first part of this diploma thesis is to design an energy-efficient hotel with restaurant and car parking. The second part is also to create an assessment of the energy performance of the building and usage of energy from renewable sources. Hotel is designed with the idea of „smart buildings“ which means, that all the technological background is controlled by the main computer, which also harvests data to achieve a minimum energy use and financial demand and maximum comfort and safety at the same time by controlling the connected technology. By placing on a sloped terrain in the center of Brno, the basement floor can be used as car parking. The roof of this building is flat, green, with modifications for placing solar panels, whose design is part of this work. The third part of this diploma thesis is the spatial acoustics of the conference room on the first ground floor.
|
Page generated in 0.0752 seconds