51 |
Flow shop sequencing subject to a makespan constraintAndo, Naohiko 08 1900 (has links)
No description available.
|
52 |
A methodology for the implementation of computer based routingAndrus, Scot Gorden 12 1900 (has links)
No description available.
|
53 |
Space-time considerations in production-distribution modelsDieck-Assad, Antonio Jose 08 1900 (has links)
No description available.
|
54 |
A study of the economics of force molting in commercial egg production under conditions of certainty and uncertaintyParlour, James Wilson 19 July 1969 (has links)
Graduation date: 1970
|
55 |
Design and implementation of a production scheduling system for continuous manufacturing environmentRai, Nivruti 12 October 1993 (has links)
Scheduling a continuous manufacturing flow shop environment with several
machines, stochastic arrival of demands, different product requirements and limited
resources is a complex task. This research develops a methodology for scheduling
products in glass fiber industry. The system consists of two components. An optimizing
linear program determines the optimal solution for a sub-problem that accounts for
safety stocks, demands, machine capacities, and due dates. The job queues from the LP
model are then sequenced based on 'earliest job due date' for machines that have two
or more jobs to be performed on the same time. This sequenced solution is then input
to a simulation model. The simulation model prioritizes the queue of jobs on each
machine so that minimum rate of change of throughput is achieved, while satisfying the
due dates. The model was validated for a major fiber galss manufacturer. The results
show that the use of an integrated optimizing and heuristic solution system provides
better results than current scheduling practice in terms of machine utilization,
deviations from target inventories, and on-time jobs. / Graduation date: 1994
|
56 |
Structured analysis for the job shop promise dateYao, Jea-Sheng. January 1988 (has links)
Thesis (M.S.)--Ohio University, August, 1988. / Title from PDF t.p.
|
57 |
Development of computer code for job shop scheduling based upon Rogers generalized scheduling model and Rogers-Rodammer heuristic.Jayakrishnan, Krishnamohan. January 1988 (has links)
Thesis (M.S.)--Ohio University, November, 1988. / Title from PDF t.p.
|
58 |
Manufacturing strategy : an empirical analysis /Sharma, Deven, January 1987 (has links)
Thesis (Ph. D.)--Ohio State University, 1987. / Includes vita. Includes bibliographical references (leaves 237-250). Available online via OhioLINK's ETD Center.
|
59 |
Control charts interpretation system a protype [sic] expert system for patterns recognition on control charts.Kuo, Tsuang-Yih. January 1989 (has links)
Thesis (M.S.)--Ohio University, August, 1989. / Title from PDF t.p.
|
60 |
"A branch-and-bound priority rule to minimize WIP and tardiness in job-shop problem.Stithit, Wuttikorn. January 1991 (has links)
Thesis (M.S.)--Ohio University, August, 1991. / Title from PDF t.p.
|
Page generated in 0.093 seconds