131 |
The essentials of project management in tackling the change of year 2000 on computer systems of an airline /Ku, Ming-pui. January 1997 (has links)
Thesis (M.B.A.)--University of Hong Kong, 1997. / Includes bibliographical references (leaf 100).
|
132 |
Evaluation of the outcome of construction projects /Liu, Mei-mai, Anita. January 1995 (has links)
Thesis (Ph. D.)--University of Hong Kong, 1995. / Includes bibliographical references (leaves 266-275).
|
133 |
Comparison of module usage of project management information system and success rate of construction projectsSweet, Coretta A. January 2009 (has links)
Thesis (M. S.)--Building Construction, Georgia Institute of Technology, 2009. / Committee Chair: Dr. Linda Thomas-Mobley; Committee Member: Dr. Daniel Castro; Committee Member: Prof. Kathy Roper; Committee Member: Ron L. Smith.
|
134 |
Innovation in Hong Kong constructionKwok, Chun-kin, Desmond. January 2005 (has links)
Thesis (M. Sc.)--University of Hong Kong, 2005. / Title proper from title frame. Also available in printed format.
|
135 |
Implementation of Coeus grant management software at the Desert Research InstituteKingsmill, Patricia. January 2005 (has links) (PDF)
Thesis (M.S.C.I.T.)--Regis University, Denver, Colo., 2005. / Title from PDF title page (viewed on Feb. 17, 2006). Includes bibliographical references.
|
136 |
Developing best practices for industrial project life cycle security and a methodology for measuring implementationSylvie, Jonathan R. Haas, Carl T. Thomas, Stephen Richard, January 2005 (has links) (PDF)
Thesis (Ph. D.)--University of Texas at Austin, 2005. / Supervisors: Carl T. Haas and Stephen R. Thomas. Vita. Includes bibliographical references.
|
137 |
Managing risks in complex projects using compression strategies /Mitchell, Gary F. January 2005 (has links)
Thesis (Ph. D.)--University of Washington, 2005. / Vita. Includes bibliographical references (leaves 189-195).
|
138 |
An action research proposal for project failures at company XYZGuha, Santosh M. January 2007 (has links) (PDF)
Thesis (M.S.M.)--Regis University, Denver, Colo., 2007. / Title from PDF p. 9 (viewed on May 25, 2007). Includes bibliographical references.
|
139 |
Investigation into the under-representation of women in project management in China's Information, Communication and Technology sectorHu, Yuan Yuan January 2017 (has links)
This project investigates some aspects of why a minority of ICT project management professionals in the Chinese ICT sector are female. It investigates differences between sexes in their perceived image and knowledge of ICT work, and the relationship between their career paths and gender roles. A literature review identified that little research on women in ICT in China had been carried out prior to this project. The literature on women in traditional male industries (e.g. ICT, engineer, civil engineer) in western countries yielded certain insights and transferable research methods. A pilot interview survey of four parents, six tutors, six students and eight ICT practitioners was undertaken to develop the main semi-structured interview survey instruments. The main survey yielded responses from thirty students and thirty ICT practitioners. The data interpretation and analysis method adopted grounded theory since, as mentioned above; there little relevant research has been carried out on the topic in China. The results are presented in a consistent way to make the data more comparable. Conclusions are drawn based on findings arising from the body of work and academia as a whole. There were found to be some differences between sexes in certain aspects of their views of ICT (project management) work and aspiration to career choice and advancement. The ICT sector has as a working environment is characterised by conflict (androgynous and male-dominant working style), competence, and keeping abreast of developing ICT technologies, which are thought to be more suitable to men. Gender division actually exists, and family responsibilities hold women back in their career advancement in the ICT sector in China.
|
140 |
Assessment of the time orientation of clinical research associates in the pharmaceutical industry of South AfricaRas, Koretha January 2007 (has links)
iv
ABSTRACT
This research study was the first to investigate the nature of time-use behaviour of the
South African Clinical Research Associates (CRA’s) and Clinical Trial Managers
(CTM’s). The study determined the relative polychronicity of project members in clinical
trials in South Africa and identified possible non-alignment in the approaches and
expectations between managers of clinical research projects and that of their project
staff members. The study assumed that the clinical trial project environment is
monochronic by nature. Information about a possible mismatch in expected temporal
orientation of project staff and real temporal orientation of project staff would constitute
grounds for adaptation of project management execution guidelines and staff selection
processes for CRA’s and Managers of clinical trials.
Quantitative data were collected through the Inventory of Polychronic Values measuring
instrument from a sample of the total registered membership base of the South African
Clinical Research Association by means of a web based questionnaire. The study
analysed the relationships between the following three constructs of relevance:
1. CRA’s own personal preferences for time-use, and
2. CRA’s perceptions of what time-use behaviour their direct managers expect
from them, and
3. Managers’ expectations for the time-use behaviour of CRA’s.
CRA’s were found to be relatively monochronic in their work behaviour towards time-use
and Managers to be more polychronic than CRA’s. Within each group a range of timeuse
opinions and preferences were found. Within the constraints of sample size, Cultural
Heritage and Age were the only demographic variables found to exert significant
influence on the dependent variables in this study. A good alignment was found between
the CRA’s perceptions of the time-use behaviours expected from them and the
Managers’ expectations for time-use behaviour.
The results of this study relate to complementary role differentiation between
monochronic and polychronic people in project execution and management.
|
Page generated in 0.0823 seconds