571 |
A systems engineering approach towards scheduling and operations at the Peninsula Center /Macri, Steven. January 1992 (has links)
Report (M.S.)--Virginia Polytechnic Institute and State University. M.S. 1992. / Vita. Abstract. Includes bibliographical references (leaf 97). Also available via the Internet.
|
572 |
Techniken zur Simulation von eingebetteten Systemen mit abstrakten RTOS-ModellenZabel, Henning January 2010 (has links)
Zugl.: Paderborn, Univ., Diss., 2010
|
573 |
A genetic algorithm approach to production scheduling in an ion plating cellAu, Kam-chi, Gigi. January 2004 (has links)
Thesis (M. Phil.)--University of Hong Kong, 2005. / Title proper from title frame. Also available in printed format.
|
574 |
The role of disk scheduling in multiprogrammed computer systemsTeorey, Toby J. January 1900 (has links)
Thesis (Ph. D.)--University of Wisconsin--Madison, 1972. / Typescript. Vita. Description based on print version record. Includes bibliographical references (leaves 141-145).
|
575 |
Dynamic stochastic vehicle routing model in home healthcare scheduling /Gurumurthy, Prakash. January 2004 (has links)
Thesis (M.S.)--University of Missouri-Columbia, 2004. / Typescript. Includes bibliographical references (leaves 103-106). Also available on the Internet.
|
576 |
Evaluation der Leistungsfähigkeit von gemischt-parallelen Programmen in homogenen und heterogenen Umgebungen unter Berücksichtigung effizienter SchedulingstrategienHunold, Sascha. Unknown Date (has links) (PDF)
Universiẗat, Diss., 2009--Bayreuth.
|
577 |
Prediction of job completion times and optimal overtime allocation for satisfying production due dates /Liu, Olivia. January 2006 (has links)
Thesis (M.S.)--Rochester Institute of Technology, 2006. / Typescript. Includes bibliographical references (leaves 79-81).
|
578 |
Application of hard real-time scheduling algorithms in periodic network transmissions /Erkan, Ali, January 2006 (has links)
Thesis (Ph. D.)--Lehigh University, 2006. / Includes vita. Includes bibliographical references (leaves 148-152).
|
579 |
Efficient sequential simulation methods with implications to long-term production scheduling /Benndorf, Jorg. January 2005 (has links) (PDF)
Thesis (Ph.D.) - University of Queensland, 2005. / Includes bibliography.
|
580 |
Minimizing the makespan in a flexible flowshop with sequence dependent setup times, uniform machines, and limited buffersCrowder, Bret. January 2006 (has links)
Thesis (M.S.)--West Virginia University, 2006. / Title from document title page. Document formatted into pages; contains viii, 136 p. : ill. Includes abstract. Includes bibliographical references (p. 96-106).
|
Page generated in 0.0858 seconds