Spelling suggestions: "subject:"shear compiling""
11 |
Založení mostu / Foundation of BridgeŠčudla, Martin January 2014 (has links)
The thesis focuses on design of 5 - square bridge foundation in Ostrava Svinov including covering of construction pits. The bridge is founded on the groups of drilled large diameter piles. Design and assessment is realized in program GEO 5. The thesis is divided into 6 parts: introduction, geotechnical circumstances, concomitant report, static calculations, technical report and documentation.
|
Page generated in 0.075 seconds