11 |
Střelnice & lasergame aréna „Eagle eye“ / Shooting range & lasergame arena "Eagle Eye"Javůrek, Martin January 2018 (has links)
The subject of this project is a new building of a shooting range and lasergame arena in Brno, district Královo pole. The aim of the thesis is to create a documentation for realization of a shooting range and lasergame arena. It is a stand-alone two-storey building without the basement. The building is based on piled foundations, the construction system is reinforced concrete frame, infill material is light concrete brick. There is an exception: in the tunnel shooting range, there are monolithic reinforced concrete walls. The ceilings above the first floor are made also of reinforced concrete, the ceiling above the second floor / roof is made of pre-stressed reinforced concrete roof panels of spiroll type. There is flat, single-layer roof. The walls are designed as double-layered, contact-insulated with fiber-cement cladding.
|
12 |
Zřízení střelnice / Establishment of The Shooting RangeNečasová, Silvie January 2015 (has links)
This thesis considers the proposed business plan – establishment of the shooting range, which outlines the present difficult conditions which exist in the society. Thesis is conceived as a project for investor with sufficient funding for implementation. It is derived from a complex analyses of the external and internal factors, changes and estimates of internal performance parameters aligned to the agreed strategic design. The aim is to produce a essential document which sets out a clear statement of the future direction of the business and its desired position including the identification of the resources required to achieve that goal.
|
13 |
Obvodní oddělení Policie ČR v Brně Bohunicích / District police department of the Czech Republic in Brno-BohuniceLengyel, Aleš January 2020 (has links)
The master´s thesis elaborates the project documentation for the construction of the District Police of the Czech Republic in Brno. The new building is situated in the north of city part Bohunice. It´s a three- floor object with partial basement and flat roof. The bearing perimeter masonry, internal bearing masonry and internal non- load bearing masonry are made with technology from ceramic hollow blocks. Ceiling construction is designed from prestressed ceiling panels. The perimeter walls of the of the underground floor are made from blocks of lost formwork, which is insulated with extruded polystyrene. The walls on the above- ground floors are insulated by a combination of contact thermal insulation system and ventilated facades with fiber- cement facade cladding boards.
|
Page generated in 0.0908 seconds