• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 142
  • 2
  • 1
  • Tagged with
  • 145
  • 98
  • 98
  • 94
  • 79
  • 68
  • 65
  • 64
  • 59
  • 58
  • 47
  • 47
  • 45
  • 43
  • 37
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Regulace úrokových sazeb

Šamšulová, Jana January 2013 (has links)
No description available.
2

Interiér zámecké restaurace

Jurůjová, Lucie January 2015 (has links)
This master thesis deals with interior design of the chateau restaurant in Kroměříž. The design is based on investor's requirements and also on general principles of interior design. The creative concept is inspired by the building itself and its historical rooms. The thesis contains a design of an atypical furniture unit -- a bar counter, including its technical drawings and a preliminary calculation of its material cost.
3

Analýza vybraných príčin krízy dlhového stropu v USA / Analysis of the selected causes of the debt ceiling crisis in the United States

Lukács, Viktória January 2012 (has links)
The aim of this thesis is to analyze selected causes of the current debt ceiling crisis in the United States, which culminated in 2011. The first part deals with the development of the debt ceiling in the U.S. and the historically important increases in the limit. Selected expenditure items of the U.S federal budget are analyzed for their creation of the high deficit and debt limit crises in the country, with focus on the costs of the health and social security systems. The second part analyzes the inefficiencies of these systems and the economic measures accepted from 2004 -2012 associated with the debt ceiling increases, which led to the analyzed crisis in 2011.
4

Špecifiká kariérneho rozvoja žien / Specifics of career development of women

Oleárová, Petra January 2010 (has links)
Main goal of diploma thesis is to show what motivates women in their career, where they see the barriers. It also gives a look at the specific organizations, institutions and documents which focus on equal opportunities.
5

The Women in Top Management:The Case Study of EY company / Ženy v top managemente: Prípadová štúdia spoločnosti EY

Tomčovčíková, Michaela January 2015 (has links)
The thesis analyses the course and tempo of women´s careers in comparison with those of men, based on an analysis of my own research conducted at the company EY. The results of the research demonstrates, whether it is more challenging for women or men to achieve a managerial position. The thesis identifies and analyse the different factors that may influence the career of women, based on the theoretical findings and on a qualitative interview.
6

Adaptace a dostavba domova důchodců / Adaptation and completion of retirement home

Ulyanov, Roman January 2019 (has links)
The subject of this diploma thesis is the construction of Adaptation and completion of retirement home. The building is located in Otovice, district of Karlovy Vary. The building is divided into two building objects. The first is a single-storey new building with a double-decker connecting neck. The new building serves as an office building and provides 24 hours care. The second building is the existing building in which the rooms are located. The new building is designed in combination with several building materials - monolithic reinforced concrete walls, Porotherm blocks and steel columns and beams. The track construction is designed as a monolithic reinforced concrete slab.
7

Polyfunkční dům / Multifunctional building

Szabó, Beáta January 2013 (has links)
The diploma work is dealing with a new building multifunctional building, which is divided to a medical center and two flats for living. The building has three floors with different altitudes and partial cellar. The object is covered by flat roof. The location of the house is on a mildly slanting surface. The basics is made of concrete C16/20. External walls are stalled from POROTHERM 44 P+D and insulated system ETICS. The internal vertical walls are made from POROTHERM 30 P+D and POROTHERM 36,5 AKU, partitions from blocks POROTHERM 11,5 P+D and POROTHERM 14 P+D. The ceiling construction above each floor is made from filigree panels.
8

Rekreační středisko / Rekreation center

Hugyecová, Aneta January 2013 (has links)
Diploma work is dealing with new building rekreation center for family recreation and catering. The object takes place on a flatland terrain. It is solved like a duplex, without basement and with a terrace on the second floor. The basics is made of concrete C16/20. The vertical support system is designed from blocks POROTHERM 44 Profi and 30 Profi, partitions from blocks POROTHERM 14 Profi and 8 Profi. The ceiling construction will be mounted from concrete ceiling panels SPIROLL. The object will be covered by flat roof.
9

Požární zbrojnice / Firehouse

Lavický, Pavel January 2015 (has links)
This thesis addresses the study and preparation of documentation for the new building firehouse. The building is considered the location of the fire brigade units. The building is part three storey and part two storey. The building has a steel skeletal support system to ensure stability. The ceiling structure is a composite concrete and steel. Roofed building's flat roof with a classic sequence of layers. Circuit structures are formed with Z and C profiles. Filled with mineral wool. The facade is ventilated. The ground plan is rectangular object, the maximum dimensions are 55,15x27,30 m. The building is basement, covered only with flat roofs.
10

Bytový dům / Apartment building

Bursík, Karel January 2014 (has links)
Thesis „Flat building“ is made by project documentation containing all therms required by regulations. Designed structure is placed in village Hrušovany nad Jevišovkou. Structure of the building is made from blocks and Miako ceiling. The entrance into the building is from the north side. This object has four floors. On the first level are situated cellars and two flats. On the other three floors are fourteen flats. The work includes fire safety solution and evaluation of structures and building in terms of building physics. schematic design of water supply and drainage systems and canculation of the accumulation tank.

Page generated in 0.6351 seconds