• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 142
  • 2
  • 1
  • Tagged with
  • 145
  • 98
  • 98
  • 94
  • 79
  • 68
  • 65
  • 64
  • 59
  • 58
  • 47
  • 47
  • 45
  • 43
  • 37
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
131

Obvodní oddělení policie ČR, Brno-Černovice / Police district department of the Czech Republic, Brno-Černovice

Vaníček, Marek Unknown Date (has links)
The subject of the master thesis is design of a new detached office building for public administration of Czech Republic Police as a district department in Brno-Černovice. It is presented as a form part of project documentation for a building construction. The building has a cellar and two above-ground floors. It is founded on a strip foundation and pads. The building is roofed by green roof. There are office rooms, sanitary facilities, archives, interrogation rooms, pre-trial detention cells, garages, storage rooms and dog cages in the above-ground part. In the basement, there are technical facilities and shooting range backround. Structural system of the building is wall longitudinal masonry system from clay blocks. The ceiling structure is from cast-in-place reinforced concrete. The part of the building is with ventilated facade a nd rest is insulated with contact thermal insulation.
132

Příprava realizace bytového domu v Brně - Modřicích / Preparation for the construction of an apartment building in Brno - Modřice

Růžička, Radek January 2019 (has links)
The diploma thesis deals with the lower and upper rough building of a apartment building. It includes a technical report, broader transport routes, a study of the implementation of the main technological stages, a technical report of the construction site equipment, the design of the main building machines and mechanisms, a plan for providing material resources for a reinforced concrete ceiling, a technological regulation for the rough bottom and top structure, work and monolithic constructions, gross building budget, risk plan and their measures, statement of the dimension and network graph for finishing works, thermal technical assessment of external structures, drawing of site equipment, situation, original state of the land and ramp diagram. It also contains time and financial plan of the building, schedule of the main building, schedule of construction and disposal of construction site equipment and balance of machines and workers.
133

Příprava realizace montované haly s administrativou v Praci / Preparation of a prefabricated hall with administration

Schrámek, Martin January 2019 (has links)
The subject of the diploma thesis is a preparation of a prefabricated hall with administration in Prace. The production hall will be used to produce glass fiber reinforced concrete. Next part and extension is an administrative part. The text part of the thesis contains a technical report on the building technological project, time and financial plan of the building - object, coordinating situation of the building with broader relations of the transport routes, study of the realization of the main technological stages of the building object, item budget of the main building object, time schedule of the main building, sets of the main technological stages, detection protocols for individual months, limits, balance of resources and personnel, plan of selected material sources, technical report of construction site equipment, technological regulation of precast reinforced concrete frame, technological regulation of precast concrete frame coverings Kingspan panels, Control and test plan of precast concrete frame, covering of precast concrete frame panels Kingspan and ceiling panels of the Spiroll administration, alternative suggestion of the exchange ceiling construction administration and comparison, noise study and thermal technology.
134

Polyfunkční dům / Multifunctional building

Prokop, Stanislav January 2019 (has links)
The diploma thesis deals with the design and elaboration of the project documentation of a polyfunctional house with a café in Kyjov. The new building is located in the northern part of the city. It is a 4 floor object, partlial basement building with a saddle roof. The house is based on plain concrete slabs. The supporting peripheral and internal masonry is designed from POROTHERM brick blocks. In the cafeteria, an open layout is proposed using beams and columns. Ceiling structures are designed from the POROTHERM MIAKO system. The roof structure is designed with a truss with sheet metal cover. The perimeter walls in the 1PP are designed from blocks of loose formwork filled with concrete, which are insulated with extruded polystyrene. The building is functionally divided into 2 parts, each with its own entrance. The café is equipped with a vestibule, its own café, toilet for women and men with cabins for handicapped visitors and a background with a storeroom, dressing room and WC with a hall. The residential part consists of 4 garages and 6 apartments, 2 of which are adapted for the handicapped. The object is designed with natural ventilation. The object is barrier-free. In front of the building is proposed a parking space for 9 seats, 2 of which are designed for handicapped and 2 for apartment owners.
135

Stavebně technologický projekt výstavby komplexu RD SLAVKOV - Pod Zlatou horou / Construction Project for Implementation of Houses in Slavkov - Pod Zlatou horou

Kurková, Dita January 2020 (has links)
The subject of the diploma thesis is the solution of chosen parts of the construction technology project of the 1st phase of the construction „Komplex RD Slavkov, Pod Zlatou horou“. These are 4 semi-detached houses, overall 8 family houses. The work deals with technological regulations for the superstructure including roof, study of the realization of the construction technology project, design of the main construction machines and mechanisms and control and test plan. For the whole construction is elaborated time and financial plan in two variants, namely the gradual and current method of construction, and a detailed schedule for one semi-detached house. The technical report of the building site equipment is completed with the drawings, itemized budget of the building part of the house, noise study and specialization focused on the photovoltaic system, with an alternative solution to use solar collectors. The thesis also includes a case study of construction methods focused on the gradual and current method of construction.
136

Bytový dům, Újezd u Brna / Block of flats, Újezd u Brna

Sedláček, Ondřej January 2013 (has links)
This work deals with a new building – block of flats on land no. 1799/1, 1800/1 cadastral Újezd u Brna, region Brno - venkov. This building contains 15 individual flats. The object is geometrically divided on central part with gabled roof and 2 side parts with hip roof. Slopes of roofs 10°. Building is designed as three-storey object without a cellarage, whence all three storeys are residential . The building is accessible from local road and it is possible to park a car next to the object in new-build parking place. Residential rooms are positively rotated to south and ventilated naturally. All the residential rooms are exposed to direct day light. Sidewalk and hard surface are treated as concrete and scrubbed pavement. Construction peripheral bearing masonry, interior bearing masonry and cross buntons effected from ceramic breeze-block POROTHERM. Ceilings plates are made of reinforced concrete. Staircase are made of reinforced concrete as well.
137

Bytový dům / Residential Building

Uhlíř, Karel January 2013 (has links)
Diploma thesis develops comprehensive documentation of the new building construction of residential house on the level of the implementation of the project construction. Proposal emphasizes layout of linked to ensure the technical design, structural, fire safety, protection against noise, energy saving, safety in use. Work is performed in an electronic format using AutoCAD and Microsoft Word (PDF Creator).
138

Stavebně technologický projekt Výzkumného centra Fakulty informačních technologií VUT v Brně / Construction technology project of Research centre Faculty of Information Technology in Brno

Chytková, Monika January 2013 (has links)
This Máster´s thesis deals with technological project of building a Research Center of Information Technologies VUT Brno in Brno. This work includes technical reports SY and STP, site equipment, budget, calculation, time planning, inspection and test plan, mechanical assembly, estimate,technological regulations, environmental plan, contract for work and job security for this building.
139

Horský hotel / Mountain hotel

Vandrovec, Aleš January 2014 (has links)
Master’s thesis theme is mountain hotel project. The hotel has one lower basement and four aboveground floor. It has trditional look and the roof is double-pitched. Floor projection looks like letter "L". Main part has measurements 25,3 x 14,1 m and it has four floor. Extension is on northwest side of main part. It has measuremnts 11,85 x 9,5 m and three floor. Facede of basement and first floor is from stone facing mansory. Facade od second floor of main patr of buildings id timbered looks like curb. Third and fourth floor are attic, gable is vertical timbered. Facade of second floor of extension is plaster on ETICS. The gable od extension is vertical timbered. Roof covering is alpen shingle from larch wood. Foundations of house are shallow. The construction system is walled. The lower basement is built from masonry BS Klatovy BD30 and other wall are from masonry Porotherm . Floor structures are from monolithic reinforced concrete, thickness 220 mm. House stairs are prefabricated double-flight. Partition wall are mostly built from mansory Porotherm 11,5 P+D. Lintols above windows and doors in facadeare made by reverse of floor slab and inside of disposition are made by ceramics lintols Porotherm. Floor structures are floating with impact insulation in whole house. In living rooms wear layers are from oak parquet block and in common rooms, toilets, bathrooms and technical rooms is ceramics paving. Wall’s surfaces are made from patent plaster and in lower basement are made from two-coat work with white coat. Toilets and bathrooms are tilled with ceramic tiles. All distributions of building equipment are covered with gypsum plasterboard ceiling. All windows and doors in facade are made by wooden profile Solid comfort SC78 and glazed by triple glazing unit (Uw,max=0,9 W/m2.K), exception is main entrance door, It is made by aluminum profile and it is automatically opened.
140

Administrative building with low energy footprint / Administrativní budova s nízkou energetickou stopou

Slepánek, František January 2015 (has links)
The aim of this diploma thesis is trying to solve difficulties connected with administrative buildings. In this thesis we are talking about possibility that administrative building can have low energy footprint. Most of energy consumption of administrative building is not created by heating but mostly by cooling and by consumption of office equipment. That is why there have been used modern equipment of the building as well as automatic control of building equipment.

Page generated in 0.0338 seconds