• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 14
  • Tagged with
  • 14
  • 14
  • 7
  • 7
  • 7
  • 7
  • 6
  • 5
  • 5
  • 5
  • 4
  • 4
  • 4
  • 4
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Studie úrovňové křižovatky I/45 a I/11 v Bruntále / The study level crossings I / 45 and I / 11 in Bruntal

Kufka, Jiří January 2017 (has links)
The subject of my Master’s thesis is the variant redevelopment of level crossings I/45 and I/11 nearby bus terminal in Bruntál in Moravian-Silesian region. The current design isn’t well arranged and the crossroad is place of frequent traffic accidents. There are four solutions of existing crossroad. In the frame of variants, there is a different manner of solution of structural layout of crossroad, possibility of connection of shopping center and solution of pedestrian traffic. The thesis includes traffic survey, evaluation of accidents, capacity analysis of existing crossroad and four new solutions and estimate of building costs.
12

Studie křižovatky ulic Hlavní třída a Slezská ve Frýdku-Místku / Crossroad Hlavní třída a Slezská street in Frýdek-Místek - study

Sláviková, Ľubica January 2020 (has links)
The subject of this diploma thesis is variant design of adaptation of T- intersection to crossroad at Frýdek-Místek. At first, there was made traffic forecast of generated traffic from regional planning. After that, there were made traffic forecast from relocation of road II/477. Then for every traffic forecast there were made two more variants of designs. The first variant is designed by one lane roundabout and signal-controlled intersection with signal timing plan. The second and the third variant are designed by turbo roundabout and signal-controlled intersection with signal timing plan. All variants have their own capacity analysis.
13

MÚK na R52 - Moravany / Junction on Motorway R52 near Moravany

Lička, Vojtěch January 2014 (has links)
My diploma thesis deals with a connection of Videňská street to the future residential district situated between Přízřenice and Modřice. The level of this thesis is a technical study. The main topic of the thesis is a design of an interchange on the Vídeňská and Moravanská streets. The thesis is focused on a technical verification of variable ramps’ connections from Vídeňská street to Moravanská street. Another important point of the thesis is an improvement of security quality of cycle traffic and a creation of a traffic junction of the city transportation system in this area. The SWOT analysis was applied to evaluation and selection the most advantageous variant of the variants. Depending on SWOT analysis, the thesis is focused on more detailed design of the most advantageous variant.
14

Řešení dopravy v centru Havlíčkova Brodu / Traffic situation in the city centre of Havlíčkův Brod and its solution

Tobek, Miroslav January 2013 (has links)
The aim of this diploma thesis is the solution of the traffic situation in the city center of Havlíčkův Brod. Mainly the ground road number II/150 adjustment, which consist in the modification of the two-way traffic to one-way traffic organization in the streets Dolní, Žižkova and Na Ostrově by using the analogy of a roundabout layout, is solved within this thesis. All mentioned modifications simplify the traffic situation, improve the orientation and increase the security and the traffic flow mainly in relation to pedestrians and cyclists. Another part of this thesis is focused on revitalization of the public spaces in front of the community center called Ostrov and junction of existing cycle tracks situated on the both banks of the Sázava river. In relation to this topic the adjustment of rainwater sewerage system, low-voltage above ground network, public lighting, communication electric cables, fire brigade signal lights and low-pressure gas pipeline is also solved.

Page generated in 0.0315 seconds