• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 289
  • 11
  • 1
  • Tagged with
  • 305
  • 305
  • 287
  • 284
  • 278
  • 268
  • 260
  • 258
  • 250
  • 241
  • 227
  • 211
  • 210
  • 210
  • 199
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
131

Objekt B3 bytového komplexu Sadová - stavebně technologický projekt / Building B3 of the Sadová residential complex - building technology project

Jílek, Jan January 2020 (has links)
The subject of thesis is construction technological project of B3 object, aiming at apartment building, which is the main building object. The apartment building consists of four above-ground floors and is established on foundation strips. The principal of thesis elaboration is the budget of the main object and the construction schedule. The diploma thesis also deals with the draft of construction site equipment for particular steps of construction, the construction organization, the lifting mechanism design, the technological regulation for selected operation, the transport accessibility and the protection of health and safety at work taking into account environmental protection.
132

Stavebně technologický projekt objektu v areálu Rotana / Construction-technological project of the building in the area of Rotana

Kadlec, Michal January 2020 (has links)
The aim of the diploma thesis is to process a construction-technological project of the building in the area Rotana. The aim of the thesis is to propose a suitable implementation procedure of the building. The thesis deals with the time schedule of the main object, itemized budget, major building machines and mechanisms, project of site equipment, study of the main construction phase realization, plan for securing material resources, technical report, time and financial object plan. The thesis also focused on the comparison bracing of foundation with the slopes.
133

Realizace novostavby hasičské zbrojnice ve Ždírci nad Doubravou / Realization of Construction of Firehouse in Ždírec nad Doubravou

Kazda, Jiří January 2020 (has links)
The master´s thesis describes the realization of new building of fire station in Ždírec nad Doubravou. The parts of the thesis are time and financial plan for all building objects, assessment of transport routes, design of site equipment and design of main machines. An itimized budget with a bill of quantities and a detailed construction schedule are prepared for the main building. A technological regulativ and quality control plan are prepared for the stage of industrial steelconcrete floor. In the end of the work, there is solved the noise study of construction and the topic of system infiltration tanks.
134

Volnočasové centrum v Praze, stavebně technologická příprava stavby. / Leisure Center in Prag, civil technical project.

Medvedeva, Svetlana January 2020 (has links)
The diploma thesis solves the construction technology project of the Leisure Center Na Fialce in Říčany near Prague. This construction technology project includes a technical report to the construction technology project, coordination situation with broader links of transport routes, construction time and financial plan, study of im-plementation of the main technological stages, construction site design, design of main construction machines and mechanisms, plan of securing material resources for rough construction of solved objects, technological regulation for implementati-on of insulation of substructure and execution of monolithic reinforced concrete ceiling, inspection and test plan for implementation of insulation of substructure and execution of monolithic reinforced concrete ceiling, safety measures on site and proposal of alternative solution.
135

Administrativní budova v Brně, stavebně technologická příprava stavby. / Administrative bulding in Brno, civil technical projekt.

Romashkyn, Mykola January 2020 (has links)
The subject of this diploma thesis is civil technical project of an administrative building in Brno. The work includes a technical report, a construction technology study, technological prescriptions, proposal of suitable machines and mechanisms required for construction and wider relationships of transport routes to construction site. It also includes control and test plans, a detailed timetable for the main building object, deployment plans for workers, major work machinery and mechanisms, an item budget and a construction site equipment project. Finally, there are drawings of boarding foundations and ceiling structures and a comparison of the two variants of the ceiling structures.
136

Bytový dům AB - Javorová čtvrť II Praha - stavebně technologický projekt / Apartment Building - Javorová čtvrť II Praha - Building Technology Project

Schreiber, Jiří January 2020 (has links)
Theme of the diploma thesis is technical report of the technological project for apartment building AB – Maple district II Prague, which will be realized on Mantovska street, on the plot 539/39 in the district of Horní Měcholupy. For object AB is proccesed technical report of the technological project, studies of realization main technological phases, solution of wider transport relations with a focus on building supply , objects time and financial plan, time schedule, project for site facilities with drawing of five main technological phases, design of main construction machines and mechanisms, technological specification for realization of monolithic reinforced concrete of roughly lower and upper construction, including „white tank“, which forms a peripheral structure of lower construction, balance of workers and main machines, inspection and test plan for constructions from technological specification. As other assignment I make a itemized budget for rough construction, selected points of LEED certification, instructions for using a housing unit and plan of Safety and Helth protection during work.
137

Bytový dům Mrštíkova Hustopeče, Blok B - stavebně technologický projekt / Apartment house Mrštíkova, Block B - construction technology project

Ševčík, Daniel January 2020 (has links)
This master’s thesis is focused on technological and constructional project of apartment building – Block „B“ in the Hustopeče city. Content of this thesis includes engineering report of technological project, construction site equipment, used machinery, situational concept of transport routes and technological regulations for drilled pilots. This thesis also contains construction time schledule, itemized budget and assessment of the masonry systems.
138

Skladový areál firmy Bidfood - stavebně technologický projekt / Bidfood warehouse - a construction technology project

Špaček, Miroslav January 2020 (has links)
The goal of the thesis is a construction technological project of a Bidfood warehouse. Part of the work is the solution of technological regulation for drilled piles and assembly of steel skeleton, organization of the construction, construction site equipment plan, draft of the main machinery and mechanisms. Technical report, coordination layout with a description of transport options, schedule, and financial plan are also part of this thesis.
139

Stavebně technologická příprava skladového a administrativního objektu v Černé za Bory / Construction-Technological Preparation of Warehouse and Administrative Building in Černá za Bory

Štěpánek, Michal January 2020 (has links)
The aim of this diploma thesis is the construction and technological solution of the warehouse and administrative building in Černá za Bory. The diploma thesis contains technological procedures for assembly of reinforced concrete skeleton and realization of industrial floor. This work solves problems that could arise during the assembly of the skeleton and realization of industrial floor. The thesis contains a construction technology project, a study of the implementation of the main technological stages, the situation of the construction with broader relations of transport routes, the project of construction site equipment and the main design of machines and mechanisms. Furthermore, I created a variant solution of skeleton assembly including financial and time evaluation. Since the project documentation that was provided to me did not include any details for the skeleton placement, I decided to develop design details for the skeleton placement. Subsequently, I developed a plan for occupational safety and health. As a part of this work I made a comparison of industrial floors, both in terms of performance and economic. In order to find out the time demands, I prepared an exact timetable for the implementation of the main building. In order to ensure high safety and quality, I prepared a control and testing plan for the assembly of the skeleton and for the implementation of industrial flooring.
140

Stavebně technologický projekt vývojového centra v Jaroměři / Constriction-Technological Project of Development Center in Jaroměř

Kytlík, David January 2020 (has links)
The content of this this diploma thesis is structurally technical project of development center in Jaroměř. The building is situated in a V shape and it consists of two production halls and the projection building. Halls and projection building are conected with a special hall. The building of projection have two floors and halls have one floor. The thesis contains a technical report of the construction-technological project, studies of realization of the main technological stages and report of the building equipment. The thesis also deals with design of the main building machines, report of the drilled piles and theirs inspection and test plan. There is also time and financial plan for individual objects and for the main building object, information about safety and healt protection during work and itemized budget. At least is the study of a green roof.

Page generated in 0.083 seconds