• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 7
  • 3
  • 3
  • 1
  • Tagged with
  • 15
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

江戸時代における百姓内山と御槫木山の森林とその利用 ―信州伊那郡大河原村・鹿塩村古文書資料から得られる知見―

松原, 輝男, Matsubara, Teruo 03 1900 (has links)
キーワード・抄録は著者により付与された
12

Penzion v Orlických horách / Pension in Eagle Mountains

Dvořák, Martin January 2013 (has links)
The thesis subject deals with processing of documentation of new boarding house in the Eagle Mountains. The boarding house is free-standing building with a cellar and aboveground three floors situated in sloping terrain. The boarding house is covered by gabled roof. A restaurant with background is projected in the first floor. In the second and the third floor double and triple rooms are situated. Total number of beds comes to thirty five. After finishing the house construction, the area will be put into original state, vegetation will be restored and new trees are going to be planted out. The access to building is from the south for the public and from the north for the staff. For movement of handicapped people with reduced movement ability the paved areas are designed and placed in front of the object.
13

The Battle of Fallen Timbers and the Treaty of Fort Greeneville: Why Did Anthony Wayne Win Both and Could He Have Lost?

Blair, Bryce Dixon, Jr 05 October 2005 (has links)
No description available.
14

Horský hotel v Beskydech / Mountain hotel in Beskydy

Kubášková, Barbora January 2014 (has links)
This thesis solves design of timber structure of mountain hotel in Beskydy. The hotel is two-storey building with residential attic and no cellar. The ground plan of the building is about 15x26 m and height of the building is 14,76 m. The type of roof timbers was chosen from two options. There was used structural timber of the strength class C24, glued laminated timber of the strength class GL24 and steel S235. Program Scia Engineer was used for the static analysis of the structure. There was made only linear calculation.
15

Horský hotel / Mountain hotel

Kyceltová, Lucie January 2014 (has links)
The theme of this work is the building design, brand new mountain hotel with wellness services in Spindleruv Mlyn. The plot is located in a quiet part of town, near a wooded area and form a river Labe.V designed hotel is located three floors above ground level of the building is solved attic space. Roofed by a wooden roof false hip roof. Ground unsophisticated form a geometric shape, which layout is divided into sections. On the ground floor wellness facilities, a portion of the input dopňkovými with hotel services, floor is done mainly for accommodation, as well as the attic. Hotel is equipped with a slightly sloping plot in the construction of houses and other hotels. All living spaces are naturally ventilated and illuminated. The supporting structure consists Liapor system. The appearance of the hotel is in line with the surroundings.

Page generated in 0.0311 seconds