• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 16
  • 4
  • 1
  • Tagged with
  • 25
  • 25
  • 15
  • 15
  • 15
  • 13
  • 12
  • 9
  • 9
  • 8
  • 6
  • 6
  • 6
  • 6
  • 6
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Studie rekonstrukce tramvajové tratě v ulici Veveří / Study of Tram Track in the Veveří Street

Nováková, Anna-Marie January 2022 (has links)
This thesis deals with the relocation of the tram line No. 12 from Kounicova to Veveří Street in Brno city. The No. 12 line will run together with lines No. 3 and No. 11. The proposed line is run in the local communications area. At the intersection of Veveří with Pod Kaštany Street, line No. 12 will be disconnected using the tram triangle, then it will run along Pod Kaštany and Šumavská Streets to Kounicova Street, where it will be reconnected to the original line and with the help of another tram triangle there will be a possibility to continue by the planned track along Šumavská Street. The goal of this thesis is to propose a design of tram superstructure construction, provide a solution for surrounding roads and propose the location of stops, including access to them.
22

Analýza současných metod měření prostorové polohy koleje / Analysis of Current Surveying Methods of Railway Track Spatial Position

Langar, Tomáš Unknown Date (has links)
This diploma thesis deal with analysis of current surveying methods of railway track spatial position of the track section located between Břeclav and Znojmo. At the beginning of the work there is described historical development of railway geodesy in our country and conditions of railway geodetic points field abroad. Further there are mentioned rules for measurement of railway point fields in the Czech Republic. In the following chapter you will find sub-stages of building railway point fields in track section with analysis of accuracy measurement and a proposal of prior accuracy of measurement for computing with the least square method. In the end of the thesis there is described a calculation of parameters spatial track geometry with the suggestion of computing service for uniform way of calculating partial stages of railway geodetic point field.
23

Návrh vysokorychlostní tratě mezi Brnem a Znojmem / Design of the High Speed Track between Brno and Znojmo

Repko, Michal Unknown Date (has links)
The aim of this diploma thesis is to design a new track route of high speed line from Brno to Znojmo, specifically between the planned terminal of high speed line Unkovice and existing railway station Hrušovany nad Jevišovkou. The track is designed for a maximum speed of 250 km/h. The alignment and profile of the line were designed, including the design of the railway superstructure and track geometry parameters.
24

Studie rekonstrukce železničních stanic Jindřichov na Moravě a Branná / Upgrading of Jindřichov na Moravě and Branná Railway Stations

Kubina, Jiří January 2014 (has links)
The master thesis "Upgrading of Jindřichov na Moravě and Branná Railway Stations" deals with designing new platforms that are suitable for people with reduced mobility in accordance with applicable laws and standards. Platforms with the platform edge height of 550 millimetres above the top of rail were designed. The speed limit was increased from the original 40 km/h up to 50 km/h. Moreover, the thesis design reconstruction of railway superstructure and railway substructure and deal with the drainage system.
25

Rekonstrukce železniční stanice Jeseník / Upgrading of Jeseník Railway Station

Francová, Aneta January 2015 (has links)
The master thesis "Upgrading of Jeseník Railway Stations" deals with designing new platform that is suitable for people with reduced mobility in accordance with applicable laws and standards. Platform with the platform edge height of 550 millimetres above the top of rail were designed. The speed limit was increased. Moreover, the thesis design reconstruction of railway superstructure and railway substructure and deal with the drainage system.

Page generated in 0.0847 seconds