• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 217
  • 2
  • 1
  • 1
  • Tagged with
  • 222
  • 169
  • 88
  • 86
  • 62
  • 60
  • 59
  • 50
  • 50
  • 47
  • 44
  • 42
  • 42
  • 38
  • 38
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
91

TRANSFORMACE AREÁLU PILY V OBCI BÍLÁ V BESKYDECH / TRANSFORMATION OF THE SAWMILL SITE IN MUNICIPALITY OF BÍLÁ IN THE BESKYDY

Vrzgula, Lukáš January 2019 (has links)
The thesis deals with the transformation of the former sawmill located in the center of the village of Bílá in Beskydy. The proposal addresses the gradual integration of the complex into the ski resort development structure.
92

NOVÉ STARÉ BRNO Návrat bydlení do center měst / New Old Brno Return of living to the city centres

Heralecký, Vojtěch January 2019 (has links)
The present thesis deals with an urban design covering area bounded by Křížková, Václavská, Hybešova and Nová Hybešova Streets. It offers a new design of future streets and public spaces because the thesis is an reaction to the architectural competition for the new conceptual design of Mendlovo Square. The thesis develops the area to the east and introduces a new design of the extension of Hybešova Street, new future streets and the Square. A part of this project also contains a detailed design study of the few selected city houses. The main objective is to design a sensitive urban concept aimed at increase housing density and allowing new possibilities for the designed area.
93

Vysokoškolská kolej Hradec Králové, nábřeží Orlice / University residence hall Hradec Králové, Orlice riverbank

Vlček, Marek January 2019 (has links)
The diploma project is resolving the possibilities of designing contemporary buildings into the historical context of city centre. The emphasis is aimed on urban integration of new volumes into the present city structure and its genius loci. The result of the design should be buildings with specific character and clear dispositions using quality materials. The area is located near the city centre of Hradec Králové and is defined by the streets Comenius, I.Herrmann and Hradecká. It is directly adjacent to the historic city center. In the middle of the area is flowing The Orlice River, which divides area into two separately designed zones, communicates with each other. The presence of the river is considered to be a distinctive urban-forming element that needs to be used and promoted in the city. One of the characteristics of the site is the poor state of public spaces, several significant barriers, whether moving, operational or visible and urban unconnected areas or unreasonable used areas and buildings. The surrounding of The Orlice River, flowing through the center of Hradec Králové, is from near future very important, but at the same time hard to handle. All three facts - the city center plot, the presence of the river, but also the neglected public spaces - leading this area rehabilitated, revitalized and made accessible to people.
94

Urbanisticko – architektonická studie areálu pro šetrný turismus Strachotín / Eco-friendly tourism complex Strachotín – urban and architectural study.

Panáčková, Miroslava January 2019 (has links)
This diploma thesis is focused on the urban design of the selected area in the village Strachotín and the architectural design of the building in the given locality. The aim of the proposal is to connect the building with regard to the surrounding landscape and to make the locality more attractive to tourists around the northern shore of Nové Mlýny reservoirs. The design concept is based on the modular arrangement of the individual parts of the object. Functional layout is represented by a hotel, wellness, restaurant and cosmetics production.
95

Vize pro SVIT / Vision for SVIT

Zemánková, Jasna Unknown Date (has links)
The SVIT tannery complex in Velké Meziříčí was demolished in 2008. Since then the area that is next to the Balinka river and close to the historic city center has no use. The thesis analyses the characteristics of the place, solves the connection to the surroundings, defines possible functional use and describes the vision for the complex. The aim of the thesis is to propose one of the buildings (library) in the complex in detail. The work could be used as a topic for a public discussion about the development of the territory for the inhabitants and municipal council of Velké Meziříčí.
96

Urbanistická studie obce Kunčice pod Ondřejníkem / Urban study village Kunčice under Ondřejník

Kasan, Michal January 2009 (has links)
I deal with the development of village Kunčice under Ondřejník in my master´s thesis. The task is a finding of an optimal position of the center in the inhomogenous building structure. After many considerations I choose the villagecenter in the place of today´s office and the supermarket. The new center will be consist of the three parts. First is a part of the commerce, services, post office, and the doctor. In this part will be rebuilded old officebuilding and supermarket and will be builded new supermarketstore and new building of stores, and new apartment building for strart young people. And a turistic accommodation. In the second part will be rebuilded schoolbuilding and the kindergarden. The old playground will be recultivated and also livingdistrict for seniors will be builded,for zouny merrids and families. I proposed a new function´s use of landscape of Kunčice under Ondřejník together with villagecenter.
97

Architektonický manuál pro Znojmo / Architectonic manual for Znojmo

Veselý, Josef January 2012 (has links)
This thesis aims to describe the urban development of the royal town of Znojmo from its beginning to the present and chart the settled principles of architectural and urban planning. Also aims to characterize the architectural and construction details and examples to define the negative consequences of violations of established rules.
98

Kulturní centrum Kopřivnice / Cultural Center in Koprivnice

Švancara, Ondřej January 2013 (has links)
The hint of this project was to find the way to transform the cultural buildings from 70`s and 80`s. Espaccialy its the group of buildings in the center of the sity Kopřivnice: cultural house, cinema and museum of technology, which are inapropriatte for its purpose. This transformation also shows new ways to change the whole central part of the city, which is in very insufficient conditions these days.
99

ZBROJOVKA BRNO / ZBROJOVKA FACTORY BRNO

Zabadalová, Kateřina January 2014 (has links)
Subject of master thesis is urbanist-architecture study of the postindustrial site of former factory Zbrojovka Brno. The outcome of study is focused around further construction, new functional utilisation of existing buildings and novel spacial arrangement that take into the account currently under-utilised areas of the site. Study is focused on urban poly-functionality, quality of public spaces and application of sustainable urban development principles.
100

ZBROJOVKA BRNO / ZBROJOVKA FACTORY BRNO

Kraut, Jan January 2014 (has links)
ZBROJOVKA BRNO - Opportunity for the city Strategies for Zbrojovka Brno, the third largest brownfield in the city. Urban policy and the process of integration of the site into the city and connection with his organism. Creating a territorial strategy or tactical urbanism procedure that tries successive interventions re- incorporate this into the organism of the city , in a way that fully reflect the needs , possibilities and polarity in the territory. It is essential that the established process allowed for long-term gradual regeneration, which can be interrupted by economic pressure, and in its every moment of creating a working environment that sudden interruption of restorative work in their stride. The entire process of restoring the site is divided into several phases , but at each flexibly connected and can run such a large area partially independently . Based on the current state of the complex, which is gradually opened , are removed objects that are in disrepair , and those that hinder the development of the area and its smooth functioning. Subsequently, traffic control , area connected to public transport. As a result, the situation will stabilize and rehabilitate the total area of the factory and its surroundings. All through individual interventions in its structure and public space. The whole process is documented on the basic objectives and approaches of the phases that are subsequently documented reference interventions and achievements typical of the condition of the site. All complemented by an analysis of the phenomenon of the basic tasks of rehabilitation of the site.

Page generated in 0.0481 seconds