• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 61
  • 14
  • 4
  • Tagged with
  • 79
  • 49
  • 40
  • 39
  • 27
  • 26
  • 25
  • 25
  • 21
  • 20
  • 19
  • 19
  • 17
  • 16
  • 15
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
61

Nová Jižní čtvrť a její propojení s řekou Svratkou / New South District and its Connection to Svratka

Bařinová, Anna January 2019 (has links)
Despite a few decades of discussion and the existence of all the studies on the transfer of the Brno Main Station to the river and the subsequent construction of the new Trnitá district, it has not been decided on the exact architectural form of these major urban interventions. In my pre-diploma thesis, I worked out an urban study of a new southern district - Trnitá, which gave above all a functional and mass form of the territory. This location will be extremely interesting for both the city's visitors, who will be moving from the station to the center, and of course for the potential new residents of the district. The district offers a unique combination of city life and recreation in the immediate vicinity of the natural river and park features. For a more detailed elaboration, I chose a building within a walk-through block by a river consisting of two buildings. My goal was to create a new scenery for what's happening in the neighborhood, to design new scenarios for how we can look at blocks. Given the contact with the waterfront and the river, I decided to propose both private and public functions. An important role is played by the courtyard, which defines a private space (a raised platform intended only for the residents of the house) and a public space - a creative center courtyard using a raised part as a residence bench. The mass of the house is horizontally divided into two parts. The first and second floors belong to the creative center, which is transparent with distinctive stone columns. An important goal was to show the life and movement of the center and its openness to new people and ideas - access from the yard. From the third floor there are apartments that are terraced and offer views of the river and roof terraces of deluxe apartments.
62

Bytový komplex Kadetka, příprava realizace stavby / Apartment Complex Kadetka, Preparation for Building Realisation

Páleník, Tomáš Unknown Date (has links)
The subject of the diploma thesis is to elaborate a selected part of the construction technology project for Apartment complex Kadetka - preparation for building realisation. Specifically, this is an underground garage and object C. In the course of the creation of project, the objects A and B, incorporated in the project of the construction site equipment, were also taken into account. The content of the work is a technical report to the construction technology project, evaluation of transport routes, time and financial plan, individual realization phases of the main building phase, design of the main building machine and mechanisms, time schedule for rough construction, plan for securing material resources, elaboration of technology regulations for underground monolithic reinforced concrete structures and check and test plan. The thesis also includes an item budget for the apartment house made with Build Power S software.
63

Dům krátké cesty / 5-minutes neighbourhood

Šámalová, Daniela January 2016 (has links)
The assigned territory is situated in the City of Brno, in the city district of Židenice. From the west it is limited by the railway track Brno-Židenice, from the east by Koperníkova Street, from the north by Lazaretní Street and finally from the south by Bubeníčkova Street. Its area is approximately 45, 480 m2 which is 4,55 ha. From the urban perspective it is an intensive development in a separated block of the city with a protection zone. Total area is permeated by a few lines for pedestrians. The pedestrian zone provides better permeability of the area and better accessibility of the trade parterre. The buildings connect to surrounding development and respect the density of the integrity of the area. Intensive housing structure is regarded as "the city of short distance". The achievement of high density of housing development combines lots of various functions and relatively small built-up surface. While high-quality environment is preserved, people can find job oportunities in the intensive housing development without the need for transport. For achievement conception of compact city applies space urban planning. The shape of the estate directly impacted the principle of the proposal together with the city planning context of the current buildings. In the protective zone there is established a huge park with water reservoirs. The walk-through trade parterre is filled with many various functions, on its walkable roof is created a semi-public zone with skylights and freely introduced verdure. On the walkable roof there are independent blocks of apartments and public facilities. In the northern and southern corner are located public-service utilities and in the middle of this area there is a nursery and a kindergarden. In structural terms the building it is about cast-in-place concrete reinforced frame based on a white concrete foundation which has one underground level and five above-ground levels.
64

Galerie letecké techniky a tradic letectví na letišti Medlánky v Brně / Gallery aviation technology and traditions of aviation at the airport Medlánky in Brno

Bělehradová, Věra January 2016 (has links)
Sport Airport complex Brno-Medlánky is nestled in the undulating hilly terrain in fields just beyond populated areas in Brno-Medlánky. The history of the airport dates back to 1924 when it was built the first wooden hangar for training purposes glider flights. Current state urban of airport is orderless. The aim is to streamline the complex and give it the order, allowing easy and efficient orientation in the space. The main intervention was the creation of a new central building - Aviation Museum. The concept of the design is based on the division of the whole area into two branches - communication axes, based on the mass preserved historic wooden hangars. Between the two communication arms is inserted a central axis on which is located the heart of the complex - Aviation Museum. It is a building organic form, inspiring axially symmetric wingspan (bird, airplane, beetle). It is this symmetry axis of the building creates a view towards building on the runway. Mass of the building used by the sloping terrain and is partially sunk under the ground. Building volume follows an upward slope from the outside and blends with the surrounding terrain. The internal layout consists of three floors, one of them is completely sunk below ground level and second half. The main entrance to the gallery is located in the uppermost floors, the direction of the exhibition is therefore directed downwards into the basement. The exposition is divided into six parts: RC models exposure, gliders exposure, powered aircraft exposure, screening room, children's exposure and air trainers. Other areas consist of building technical facilities. In the basement there is a workshop with aircraft lift, with the possibility of placement unexposed aircrafts. The supporting system of the building consists of two parts: reinforced concrete tubs and arched steel structure with a span of 50m.
65

Stavebně technologický projekt výstavby hotelu / Constructive technological project of the hotel

Tůma, Daniel January 2018 (has links)
This diploma thesis solves the construction technology project of construction hotel in Frýdlant. The introduction of the thesis contains basic information about the construction of the building. The presumed design and construction process are described in a construction-technological study. A time and financial object plan is also processed for the object, the total cost of which was determined from the software BuildPower S program according to the THU. Also included in this software program was an item budget for rough construction. A detailed schedule of the construction was created in Contec. In addition, suitable machines, mechanisms and site equipment are designed for the rough construction. In my work I deal mainly with the design of earthworks, rider bracing and board piles. For these stages a technological regulations and a control and test plan were implemented. A technological regulation was also created to make a white tank on the second basement floor. For the white tank is designed a formwork system with sofware DokaCad 8. Health safety and preservation at work are also addressed.
66

Bytový dům / Flat Building

Podepřel, Petr January 2020 (has links)
The thesis deals with the design and calculation of selected parts of an apartment building in Brno. The apartment building is 6 floors (one underground floor and 5 above-ground floors), the underground floor is the entire reinforced concrete. The work focuses mainly on the static design and assessment of individual elements of reinforced concrete structures. The assessed load-bearing elements are the roof slab, ceiling slab 1.PP, prefabricated staircase, elevator shaft and so-called white bath (foundation slab, walls). All calculations are performed using SCIA Engineer. Individual ceiling slabs and staircases are solved by 2D models and the construction of the white bathtub is made in a 3D model. The design proceeded according to valid European standards ČSN EN 1992-1-1 and ČSN 73 1201. The result of this work is static design of reinforcement of all solved parts and drawing documentation.
67

Vybrané části stavebně technologického projektu psychiatrické kliniky Fakultní nemocnice Brno / Selected Parts of the Construction Technology Project of the Psychiatric Clinic of the University Hospital Brno

Drozd, Michal January 2020 (has links)
The subject of my diploma thesis are selected parts of the construction technology project of the psychiatric clinic of the University Hospital Brno based on the provided project documentation. It is an extension of a new six-storey building to the existing buildings. The thesis contains a technical report to the construction technology project, the coordination situation of the construction, the situation of wider transport routes, time and financial plan by objects, study of the realization of the main technological stages, a site equipment design, a design of a machine set, technological regulation for monolithic structures, quality control and testing plan of monolithic structures, noise study and selected documents for LEED certification.
68

Občanská stavba / Civil building

Bartošová, Andrea January 2020 (has links)
Basic of this Diploma thesis is Civil construction in Kostelec nad Orlici, which is in a part of city, where is planning off-grid community housing. Part of off-grid community housing is considered a partially sistainable civil construction, serving both for cultural use through the club, for commercial purposes such as various salons (hairdresser, massage or shop), as well as for sports activities with the possibility of small refreshments, such as bouldering, climbing wall and exercise hall. Four sustainable (off-grid) familly houses, which aren´t the subject of this thesis, are considered. Object SO01 – Civil construction is designed as a partially basement, two floors. The shape of the object is designed as several blocks with different height levels. From a material point of view it is a wooden building from the system of large-format laminated wood panels (CLT). The basement is designed with a waterproof reinforced concrete so-called white tub and prefabricated ceiling panels SPIROLL. A facade is made of wooden cladding, cement-fiber boards or thin-layer silicone plaster. A roof of the object is partially flat (vegetation and walkable) and a shed roof with a slope of 5°. A dance hall and the rest of the club + exit is located in the basement. A sanitary facilities, a technical room and a main entry with reception is also located in the basement. Right in the middle of the building is a climbing wall that runs across all floors. To the right of the climbing wall is a shop, exercise hall and staircase. To the left side are a sanitary facilities, a boulder (low climbing wall) and separate staircase for a office space on the 2nd floor. Behind the climbing wall is a bistro with entry for a terrace and entry for the club. There are some establishments like a hairdresser, a cosmetic salon, a tattoo salon and a massage salon on the 2nd floor. There are an entrance to a terrace above the bistro and a staircase to an attic and to second terrace as well on the 2nd floo
69

Stavebně technologický projekt Výzkumného centra Fakulty informačních technologií VUT v Brně / Construction technology project of Research centre Faculty of Information Technology in Brno

Chytková, Monika January 2013 (has links)
This Máster´s thesis deals with technological project of building a Research Center of Information Technologies VUT Brno in Brno. This work includes technical reports SY and STP, site equipment, budget, calculation, time planning, inspection and test plan, mechanical assembly, estimate,technological regulations, environmental plan, contract for work and job security for this building.
70

Úřad práce Brno - město, stavebně technologická příprava stavby. / The Labour Office of Brno-city, civil technological project.

Surý, Viktor January 2014 (has links)
Construction Technology project deals with the new building of the Labour Office in Brno. It is the administrative building of six floors above ground and one basement floor. The building has the shape of a trapezoid. Vertical and horizontal structures are designed of reinforced concrete substructure is designed of waterproof concrete system called white tub. The project includes a technical report on the construction technology of the project, coordinating the construction situation, time and financial plan for the objects, the study of the main technological stages, the project site equipment, design of the main building machines, the schedule of the main building structure, schedule, resourcing, technical regulations for selected activities inspection and test plans for selected activities and comparing two roof building.

Page generated in 0.0343 seconds