1

Simulation of Leachate Generation from a Waste Rock Dump in Kiruna Using HYDRUS-1D / Simulering av lakvattenbildning från gråbergsdeponier i Kiruna med HYDRUS-1D

Atmosudirdjo, Aryani January 2019 (has links)
The percolation of water through waste rock dumps at mine sites can lead to the production of a leachate with high concentrations of dissolved metals, sulfate and nitrogen compounds. It is important to understand how water flows in waste rock dumps in order to predict the environmental impact of this leachate on recipients. The dynamics of percolation and leachate discharge are controlled by climatological conditions at the site, where relatively large flows in northern Sweden correspond to snowmelt during late Spring. Rock dumps are often tens of meters in height, resulting in an unsaturated water flow system through heterogeneous material. Hence, the simulation of leachate generation requires an accurate representation of the subsurface materials as well as the flow processes, where water flow in waste rock dumps is dominated by matrix flow with macropore flow being of secondary importance. Matrix flow is rather slow and may thus potentially yield relatively high concentrations of contaminants in the leachate, in response to precipitation and snow melt. This study uses Hydrus-1D to predict leachate generation from a small-scale waste rock dump in Kiruna in terms of discharge magnitude and timing. The 3-dimensional geometry of the waste rock dump is approximated by summing simulations from 1225 one-dimensional columns of different length, with a surface area of 1 m2 each. There are four output parameters that are compared between the model results and measured data: snow accumulation, water content, temperature, and discharge. There are some discrepancies between the model results and field measurements, most likely due to uncertainties in the input parameters (especially waste rock properties), limitations in the Hydrus-1D model (i.e. freeze-thaw dynamics), and assumptions that are used in constructing the conceptual model. For better agreement between model results and measured data, a new modelling approach is recommended, potentially using a different program than Hydrus-1D.
2

Linear Programming for Scheduling Waste Rock Dumping from Surface Mines

Nan Zhang Unknown Date (has links)
Abstract The removal of overlying waste rock in open pit mines to dumps is conventionally undertaken by draglines or by trucks and shovels, or by a combination of these. Waste rock dumps are the largest remnant structures of open cut mining operations and can absorb a large proportion of the mine operating costs. If the dumps are not properly developed they can be excessively expensive and can become a major safety risk and environmental hazard. There are many examples worldwide where poor design and construction of waste rock dumps have resulted in failures causing considerable loss of life and widespread damage, or have resulted in erosion and seepage that have led to severe environmental pollution. The proper design and scheduling of waste rock dumps and haul routes can significantly reduce costs, minimise the possibility of failures, and avoid harming the environment. This Thesis is limited to the consideration of trucks and shovels for waste rock haulage in open cut mining operations. It describes the development and application of a waste rock dump scheduling model using the Operations Research technique of Mixed-Integer Linear Programming, implemented in the mathematical modelling language AMPL. The model focuses on minimising the haulage cost for each block of waste rock taken from the open pit and placed in the dump. Allowance is made for the selective placement of benign and reactive waste rock, based on an open pit block model that delineates benign and reactive waste rock. The formulation requires input data including the xyz-coordinates of the block model for the open pit, information on whether the waste rock blocks are benign or reactive, the proposed time scheduling of waste rock haulage from the open pit, unit haulage costs, and the geometry of the waste rock dump, including the delineation of the zones that are benign and those that are reactive. The model was successfully tested by using both simple test data and actual mine site data. The application of the model to a simple case confirmed that it produces results that meet the Objective Function in producing an optimal haulage time and cost, and meets the various Constraints imposed. This model for scheduling the removal of waste rock from open cut mining operations with trucks and shovels will require further research and testing and, because the results are generated in a numerical format, there will also be a need to convert them to a graphical format to facilitate their interpretation. Ultimately, it will have the potential to provide a relatively low-cost scheduling tool that meets operators’ economic, safety and environmental goals.