• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 9
  • 2
  • 1
  • Tagged with
  • 12
  • 12
  • 12
  • 8
  • 7
  • 7
  • 6
  • 6
  • 6
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Ocelová konstrukce obchodního centra / Steel structure of a business centre

Kočí, Petr January 2017 (has links)
The diploma thesis elaborates on the proposal of a loadbearing steel structure of a shopping centre. Four-storey building has total lenght of 88 m, width 48 m and its base structural grid is 8 x 8 m. The total height of building is 25,4 m. First three floors above ground are designed with structural height of 5,6 m whilst the 4TH floor uses height of 4,0 m. Frame structure is formed by primary beams and castellated secondary beams. Above 4TH floor, the roof structure is designed in two alternative versions, both using solid purlins and truss girder. The 3D computer animation of the building is also part of thesis. The shopping centre that is subject of the final thesis is located in Brno area.
12

Ocelová konstrukce průmyslové budovy / Steel structure of an industrial building

Kopecký, Ladislav January 2016 (has links)
Industrial hall with storage outbuilding. The length of the hall is 72 meters and width of 30 meters. The main hall has a span 24 meters and the outbuilding has a span 6m. The distance between primary steel frame is 6 meters. The height of the main hall is 10.7 meters and a height of outbuilding is 13.0 metres. The roof is flat with roof slope of 3.5% the main hall and 8.75% outbuilding. The structural system of the hall's bar structure. Primary steel frame is designed as a steel frame rafter with eaves haunch. In the roof structure are designed purlins. The stability of the structure is secured by roof braces and longitudinal braces. The hall is pin-supported on the foundation pad. The hall is clad wall and roof panels PUR. Main hall is equipped with a bridge crane with capacity of 8 tons.

Page generated in 0.0684 seconds