Return to search

Low energy pre-blended mortars: Part 1-Control of the sand drying process using a lime drying technique

No / Produttion control methods allow factory produced mortars to be supplied to a more consistent formulation than site produced mortars. However, there is scope to enhance their "sustainability" credentials by addressing the methods of drying the wet sand and the use of lower energy hydraulic components. This paper describes the development of a technique in which quicklime is added in controlled quantities to remove free water by both chemical combination and evaporation. The slaked lime so generated is porous and a third mechanism of absorption is suggested which, however, might have adverse effects during storage of the pre-blended mortar. The principal process-control factors are lime addition based upon a ratio of the stoichiometric requirements for complete slaking of the quicklime, free moisture content of the sand, mixing time of the combined sand and quicklime, and storage of the mixed material. (C) 2015 Elsevier Ltd. All rights reserved.

Identiferoai:union.ndltd.org:BRADFORD/oai:bradscholars.brad.ac.uk:10454/9161
Date10 November 2015
CreatorsHughes, David C., Illingworth, J.M.
Source SetsBradford Scholars
LanguageEnglish
Detected LanguageEnglish
TypeArticle, No full-text in the repository

Page generated in 0.0019 seconds