Return to search

Návrh zavedení štíhlého řízení do vybraného podniku

In theoretical part of my final thesis is described lean manufacturing with 5S method. The aim of the final thesis is described in practical part. The aim was analys times parts of operations which are needed for repairing date terminals and then lower this of needed times for repairing terminals. New structure at kanban was made on workplace and thanks of this was reached required to lower times. The difference between times before and after new structure is described in discussion in final thesis with proposed for another options to lower times.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:427752
Date January 2019
CreatorsKucín, Martin
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0016 seconds