Return to search

Rehabilitation of Precast Deck Panel Bridges

USF completed a research study in 2005, which prioritized the replacement of 85 deteriorating composite precast deck panel bridges. This thesis re-evaluates the original recommendations in the wake of failures of two of these bridges in 2007. Since funding will not allow all identified bridges to be replaced, it was necessary to determine the most effective repair methods. To assess USF’s recommendations, a forensic study was undertaken in which the most current inspection and work program documents on the two failed bridges were reviewed and FDOT personnel interviewed. The best repair procedures were determined by reviewing repair plans, specifications, reports and site visits. The study found the two bridges that failed had been correctly prioritized by USF (No. 1 of 18 and No. 8 of 15). A new, accelerated repair method encompassing complete bay replacement was developed in a pilot project funded by the Florida Department of Transportation.

Identiferoai:union.ndltd.org:USF/oai:scholarcommons.usf.edu:etd-4743
Date26 October 2010
CreatorsAlvi, Atiq H.
PublisherScholar Commons
Source SetsUniversity of South Flordia
Detected LanguageEnglish
Typetext
Formatapplication/pdf
SourceGraduate Theses and Dissertations
Rightsdefault

Page generated in 0.0018 seconds