Submitted by Joana Azevedo (joanad@id.uff.br) on 2017-08-08T18:30:04Z
No. of bitstreams: 1
Dissert Janio Placido A Sousa 2.pdf: 1466743 bytes, checksum: b036600dedc214abe6a5d05ac696defd (MD5) / Approved for entry into archive by Biblioteca da Escola de Engenharia (bee@ndc.uff.br) on 2017-08-29T13:55:47Z (GMT) No. of bitstreams: 1
Dissert Janio Placido A Sousa 2.pdf: 1466743 bytes, checksum: b036600dedc214abe6a5d05ac696defd (MD5) / Made available in DSpace on 2017-08-29T13:55:47Z (GMT). No. of bitstreams: 1
Dissert Janio Placido A Sousa 2.pdf: 1466743 bytes, checksum: b036600dedc214abe6a5d05ac696defd (MD5)
Previous issue date: 2017-03-27 / As práticas de gerenciamento de projetos têm sido percebidas como relevantes pelas organizações como forma de melhorar os resultados dos seus projetos e viabilizar o alcance dos seus objetivos de negócio. Apesar de existir muita informação disponível sobre gerenciamento de projetos, não há a mesma profusão de literatura quando se trata de megaprojetos. Gerenciar projetos deste porte pode provocar efeitos indesejados, como atrasos em cronogramas e custos acima dos previstos. Estes objetivos são impactados por cronogramas que não seguem o planejado e que, muitas vezes, não consideram os riscos envolvidos. O presente estudo aborda a análise quantitativa de riscos nos cronogramas dos megaprojetos visando a contribuir para suprir a escassez de comprovações teóricas e empíricas em estudos relacionados ao gerenciamento destes projetos, principalmente quanto ao tratamento dos riscos associados a seus cronogramas. Os dados primários da pesquisa foram coletados por meio de entrevistas com cinco consultores e cinco gerentes de projetos que atuam numa empresa brasileira de energia que implanta megaprojetos no setor de óleo e gás, enquanto os dados secundários foram obtidos por meio da revisão da literatura. O estudo evidenciou a existência de subjetividades e lacunas no processo de análise de riscos, assim como a necessidade de capacitação em gestão de riscos dos gestores de nível hierárquico mais elevado, como forma de assegurar a obtenção de melhores resultados com o uso da prática no processo decisório. Como forma de reduzir estas fragilidades do processo, o estudo oferece uma proposta metodológica de análise quantitativa de riscos em cronogramas de megaprojetos que sinaliza a necessidade de incorporação de práticas de avaliação da consistência do cronograma. / Project management practices have been perceived as relevant by organizations in order to improve the results of their projects and facilitate the achievement of its business goals. Although there is much information available on project management, there isn’t the same profusion of literature when it relates to megaprojects. Manage projects of this size can cause unwanted effects, such as delays in schedules and costs overruns. These goals are impacted by schedules that do not follow the plan and often do not consider the risks involved. This study adresses megaprojects schedule risk analysis aiming to help overcome the shortage of theoretical and empirical evidence in studies related to the management of these projects, particularly for the treatment of risks associated with their schedules. The primary data for research were collected through interviews with five consultants and five project managers who work at an energy Brazilian company which undertakes megaprojects related to oil and gas sector megaprojects, and the secondary data were obtained from the literature review. The study evidenced the existence of subjectivities and gaps in risk analysis process, as well as the need for training in risk management for managers in the higher hierarchical level, as a way to ensure better results with the use of the practice in the decision-making process. As a way to reduce these weaknesses in the process, the study offers a methodological proposal for quantitative risk analysis in megaproject schedules that indicates the need to incorporate practices to evaluate the schedule consistency.
Identifer | oai:union.ndltd.org:IBICT/oai:https://app.uff.br/riuff:1/4339 |
Date | 27 March 2017 |
Creators | Sousa, Janio Placido de Araujo |
Contributors | Lima, Gilson Brito Alves, Barcaui, André Baptista, Araujo, Fernando Oliveira de |
Publisher | Universidade Federal Fluminense, Niterói |
Source Sets | IBICT Brazilian ETDs |
Language | Portuguese |
Detected Language | Portuguese |
Type | info:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis |
Source | reponame:Repositório Institucional da UFF, instname:Universidade Federal Fluminense, instacron:UFF |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.0142 seconds