This thesis examines the evaluation of the economic, environmental and social effects of dams, and lessons learned from previous dams. It then focuses on cost benefit analysis as a decision-making tool pre-project for evaluating the potential gains and losses of building a dam; and as a framework for evaluating dams in operation. It reviews the basic assumptions required for a legitimate cost benefit analysis, and the inherent limitations of this method. It uses the Sardar Sarovar dam as a case study for the use and abuse of cost benefit analysis in decision-making, interstate politics, propaganda and activism. It also illustrates the difficulties in dividing costs and benefits in an equitable manner at national, state, and grassroots levels.
Identifer | oai:union.ndltd.org:CLAREMONT/oai:http://scholarship.claremont.edu/do/oai/:scripps_theses-1310 |
Date | 01 January 2013 |
Creators | Wong, Evelyn |
Publisher | Scholarship @ Claremont |
Source Sets | Claremont Colleges |
Detected Language | English |
Type | text |
Format | application/pdf |
Source | Scripps Senior Theses |
Rights | © 2013 Evelyn Wong |
Page generated in 0.002 seconds