Zjišťování a specifikace víceprací a méněprací u stavebních dodávek a prací / Determined and Specification of Auxiliary Work in Construction Supplies and Work

The thesis deals with extra work and unrealized work that originate at construction projects and further on during realizing the construction, both at new constructions, and at reconstructions and other construction activities. It mainly focuses on their origination and optimizing their amount in individual construction phases, from preparing the project through entering into an agreement with the supplier, to carrying out the project itself. The theoretical part outlines used basic concepts according to valid laws and regulations, and introduces individual construction phases including defining extra work and unrealized work. The practical part shows a real-world example of the negative influence of such work on the investor-supplier relationships and the analysis of failures by individual participants. The result of the thesis is processing a suggestion for reducing the frequent failures caused by the extra work and unrealized work, and a consistent evidence for better argumentation and invoicing between the investor and the supplier. The main aim is to prevent conflicts between the parties that arise because of admitting the extra work and unrealized work.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:232515
Date January 2010
CreatorsLevstek (Bradáčová), Šárka
ContributorsKosová, Jaroslava, Šmahel, Milan
PublisherVysoké učení technické v Brně. Ústav soudního inženýrství
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0021 seconds