A method has been developed, Physical Hybrid Model, to investigate the physical large scale electrical effects of a Battery Energy Storage System (BESS) on a distribution grid by scaling the response from a small size Research Development and Demonstration (RD&D) platform. In order to realize the model the control system of an existing RD&D platform was refurbished and stability of components ensured. The Physical Hybrid Model proceeds as follows: Data from a distribution grid are collected. A BESS cycle curve is produced based on analyzed measurements. Required BESS power and capacity in investigated grid is scaled down by factor k to that of the physical test installation of the RD&D platform. The scaled BESS cycle is sent as input to control of the battery cycling of the RD&D platform. The response from the RD&D platform is scaled – up, and used in simulation of the distribution grid to find the impact of a BESS. The model was successfully implemented on a regional distribution grid in southern Sweden.
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:uu-176412 |
Date | January 2012 |
Creators | Weingarten, Leopold |
Publisher | Uppsala universitet, Fasta tillståndets fysik |
Source Sets | DiVA Archive at Upsalla University |
Language | English |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Relation | UPTEC ES, 1650-8300 ; 12018 |
Page generated in 0.002 seconds