Valor da informação incorporando flexibilidade operacional / Value of information incorporating operational flexibility

Orientador: Denis José Schiozer / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Mecânica e Instituto de Geociências / Made available in DSpace on 2018-08-17T11:37:31Z (GMT). No. of bitstreams: 1
Bovolenta_HumbertoDiniz_M.pdf: 3708910 bytes, checksum: d3deedef33ee30e183014a39c00fc8d5 (MD5)
Previous issue date: 2010 / Resumo: No início do desenvolvimento do campo, muitas dúvidas sobre o modelo estrutural do reservatório ainda persistem, sendo necessária a mitigação desta e do risco antes da proposição do plano final de desenvolvimento do campo. A mitigação das incertezas e riscos pode ser feita de duas maneiras: através de informações adicionais e flexibilidade operacional, porém ambas possuem limitações. As informações possuem valor dentro de um projeto até o ponto onde as vantagens obtidas pelas informações ao projeto não compensam o seu custo de aquisição. A flexibilidade pode ser impraticável pela impossibilidade de alterações práticas nas estratégias ou nas facilidades, quando essas já estão em operação. O valor da informação (VDI) e flexibilização (VDF) são recursos capazes de quantificar a relevância das informações e flexibilizações para reduzir o risco do projeto, como demonstrado pela metodologia proposta por Xavier (2004). No entanto, essa metodologia considera estratégias fixas de produção e um elevado número de poços secos nos casos sem informação, que impactam sensivelmente o valor da informação, superestimando-o. Desta forma, o objetivo deste trabalho é aprimorar a metodologia de quantificação do VDI, com a implementação de um processo automatizado assistido de seleção e otimização de estratégia, incorporando flexibilidade operacional ao projeto, através da redução do número de poços secos e dimensionamento mais preciso de estratégias de produção e facilidades. A metodologia é aplicada em dois casos: o primeiro caso onde o único atributo incerto é o modelo estrutural, voltado para validar a metodologia automatizada de otimização e seleção da estratégia de produção; o segundo exemplo possui quatro atributos incertos e a metodologia foi aplicada de forma completa. Os resultados indicam que na fase inicial do desenvolvimento, o dimensionamento mais apurado das estratégias e facilidades de produção possui impacto direto no valor monetário esperado do projeto, que se reflete no VDI e na análise de risco, o que aumenta a precisão e valor destas ferramentas em projetos com alto grau de incertezas associadas / Abstract: At the beginning of field development, many questions regarding the reservoir structural model still remain and it is necessary to mitigate this uncertainty and associated risk before the final field development plan proposition. Mitigation of risks and uncertainties can be done in two ways: through additional information acquisition and operational flexibility, but both have limitations. Information has value within a project up to the point where the benefits obtained do not outweigh its acquisition cost. Flexibility may be not viable due to the impossibility of practical changes in the production strategies or in the facilities when these are already in operation. The value of information (VOl) and value of flexibility (VOF) are resources capable of quantifying the relevance of information and flexibilities in reducing project risk, as demonstrated by the methodology proposed by Xavier (2004). However, this methodology considers fixed production strategies and a high number of dry wells, which significantly impact the value of information, overestimating it. Thus, the objective of this project is to improve this methodology through the implementation of an assisted automated process for strategy selection and optimization, incorporating operational flexibility to the project by reducing the number of dry wells and through a more accurate dimensioning of the production strategies and facilities. The methodology is applied to two cases: the first, where the only uncertain attribute is the structural model, aimed the validation of the automated methodology; the second case has four uncertain attributes and the methodology was applied in a more complete way. The results indicate that, in the initial phase of development, the more accurate design of the production strategies and facilities has a direct impact on the expected monetary value of the project, which is reflected in the VOl and in the risk analysis, increasing the accuracy and the value of these tools in projects with a high degree of associated uncertainty / Mestrado / Reservatórios e Gestão / Mestre em Ciências e Engenharia de Petróleo

Identiferoai:union.ndltd.org:IBICT/oai:repositorio.unicamp.br:REPOSIP/262971
Date17 August 2018
CreatorsBovolenta, Humberto Diniz
ContributorsUNIVERSIDADE ESTADUAL DE CAMPINAS, Schiozer, Denis José, 1963-, Trevisan, Osvair Vidal, Costa, Ana Paula de Araujo
Publisher[s.n.], Universidade Estadual de Campinas. Faculdade de Engenharia Mecânica, Universidade Estadual de Campinas. Instituto de Geociências, Programa de Pós-Graduação em Ciências e Engenharia de Petróleo
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Format124 p. : il., application/pdf
Sourcereponame:Repositório Institucional da Unicamp, instname:Universidade Estadual de Campinas, instacron:UNICAMP