Return to search

LHDA 1000 impact assessment : impact assessment report

Summary in English. / The purpose of this report is to present an impact assessment of two possible access routes to the Mohale Dam in Lesotho, namely the Western Access Road and the Least Cost Alternative Route. It is an academic work to demonstrate an adequate grasp of principles, methods and techniques appropriate to the assessment, termed LHDA 1000. The water resources of Lesotho are being exploited to augment the current supply to the PWV industrial area of the Republic of South Africa, in terms of the Lesotho Highlands Water Project. This project is being implemented in phases. Phase lA, currently being constructed, involves the damming of the Malibamatso River at Katse in the Maluti Mountains (Figure1), a transfer tunnel through the mountains, a hydroelectric power station at 'Muela in Lesotho, and a delivery tunnel under the Caledon River to the Ash River (a tributary of the Vaal River which feeds the primary PW impoundment, the Vaal Dam) in the South Africa.

Identiferoai:union.ndltd.org:netd.ac.za/oai:union.ndltd.org:uct/oai:localhost:11427/18877
Date January 1993
CreatorsAvis, Jeremy Estrup
ContributorsFuggle, Richard Francis
PublisherUniversity of Cape Town, Faculty of Science, Department of Environmental and Geographical Science
Source SetsSouth African National ETD Portal
LanguageEnglish
Detected LanguageEnglish
TypeMaster Thesis, Masters, MPhil
Formatapplication/pdf

Page generated in 0.0016 seconds