<p>This degree project was conducted in collaboration with Gremo AB located in Ätran.</p><p>The aim of the project was to develop a solution to secure quality and to help assembling</p><p>the locknut holding the vertical hinge on the harvesters and foresters from Gremo.</p><p>At this time the nut is assembled manually by the aid of an overhead crane. The nut is</p><p>tightened differently from time to time, and there was no specified torque to which it is</p><p>tightened. Another present problem was the locking washer which sometimes gets</p><p>damaged during assembly, when this happens the procedure has to be started over from</p><p>the beginning. The current assembly procedure is very time consuming and lengthy for</p><p>the employees.</p><p>Our task was to design a machine that could tighten the nut to a specified torque with a</p><p>margin of error of ± 3%. The assembly procedure will be held simple and the time</p><p>required at a minimum.</p><p>The project started by developing several principle solutions, the one solution that best</p><p>matched our specifications were developed to a primary solution.</p><p>Today we have started manufacturing and assembling our prototype. Our goal is that the</p><p>equipment will be taken into use by Gremo.</p>
Identifer | oai:union.ndltd.org:UPSALLA/oai:DiVA.org:hh-1690 |
Date | January 2008 |
Creators | Andersson, Johan, Sätermark, Daniel, Torstensson, Henric |
Publisher | Halmstad University, School of Business and Engineering (SET), Halmstad University, School of Business and Engineering (SET), Halmstad University, School of Business and Engineering (SET), Högskolan i Halmstad/Sektionen för Ekonomi och Teknik (SET) |
Source Sets | DiVA Archive at Upsalla University |
Language | Swedish |
Detected Language | English |
Type | Student thesis, text |
Page generated in 0.0011 seconds