Return to search

Rekonstrukce elektrické části vytloukacího roštu / Reconstruction of discharging shakeout machine electric installation

This Diploma work is concerned with the design of project documentation for discharging shakeout machine electric installation. This work continues in the Semestral project 2 in which the background of a new machine was made. Then, this work deals with the replacement of a switch room with required devices including the design of a new connecting cables and power streams. In the first part, the work deals with the control part of the device and the design of control and signal cables including the product documentation of the device. In the second part, the work deals with the proposal of building electro installation in which a new lighting and its use is described. The last part focuses on the coordination during the realization of a suggested device. In this part, all problems coming from the particular working procedures including a proposal of possible solutions are described. According to the project documentation and following realization, the documentation of final concept reflecting the real status of the device is described.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:241115
Date January 2016
CreatorsBednář, Vojtěch
ContributorsBlecha, Martin, Pazdera, Ivo
PublisherVysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0085 seconds