Return to search

Avaliação da aplicação da manufatura enxuta em uma empresa do setor automobilístico = um estudo de caso / Evaluation of lean manufacturing aplication in a company of the automotive industry : a case study

Orientador: Eugênio José Zoqui / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Mecânica / Made available in DSpace on 2018-08-17T17:41:59Z (GMT). No. of bitstreams: 1
Torres_LuisFernando_M.pdf: 6801856 bytes, checksum: d9d9f10d0d080aa792f5b1700f43fd3f (MD5)
Previous issue date: 2011 / Resumo: Este trabalho teve como objetivo avaliar a aplicação dos conceitos da Manufatura Enxuta em uma empresa do setor automobilístico. Esta aplicação se deu em duas áreas distintas da empresa, sendo uma delas uma máquina de forjar a quente, que apresentava aumento de demanda de 30% dos itens nela produzidos, e a outra uma família de peças responsável por grande parte do faturamento desta empresa, que não atendia às necessidades do cliente em termo de performance de entrega, com alto nível de atraso. Foram utilizadas ferramentas como a Análise dos Sete Desperdícios, Setup Rápido, Sistema Puxado e Mapeamento do Fluxo de Valores, todas suportadas pela metodologia DMAIC de implantação. Após a implantação das melhorias sugeridas em Workshops Lean por times multifuncionais, ocorreu a medição dos resultados. Para ambos os casos estudados, os resultados foram satisfatórios, como aumento do OEE, redução do Lead Time, aumento do nível de produção e redução dos tempos médios de setup, porém com discretas diferenças. Desta forma, no decorrer desta dissertação são abordados os motivos pelos quais os resultados finais foram diferentes e também o motivo pelo qual o Estudo de Caso foi o modelo de estratégia de pesquisa adotado / Abstract: This study aimed to evaluate the application of the concepts of lean manufacturing in a company of the automobile sector. This application was made in two different areas of the company, one was a hot forging machine, that there was a demand increase in 30% of the itens producedes on this machine, and the other was a family of parts responsible to much of the income from this company, that didn't attend the delivery performance requirements. For this study, some tools were used as the analysis of the Seven Wastes, Quick Setup, Pull System and Value Stream Mapping, all of them supported by DMAIC methodology. After the implementation of the suggested improvements from the workshops with multifuncional teams started to measure the results. For both studied cases, the results were satisfactory, as OEE increasing, Lead Time reduction, increased the production level and average setup time reduction, however with slight differences. Thus, throughout this dissertation examines the reasons why the final results were different and also why the case study was the model search strategy adopted / Mestrado / Materiais e Processos de Fabricação / Mestre em Engenharia Mecânica

Identiferoai:union.ndltd.org:IBICT/oai:repositorio.unicamp.br:REPOSIP/264057
Date17 August 2018
CreatorsTorres, Luis Fernando
ContributorsUNIVERSIDADE ESTADUAL DE CAMPINAS, Zoqui, Eugênio José, 1965-, Batocchio, Antonio, Fals, Hipolito Domingo Carvajal
Publisher[s.n.], Universidade Estadual de Campinas. Faculdade de Engenharia Mecânica, Programa de Pós-Graduação em Engenharia Mecânica
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguagePortuguese
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Format105 p. : il., application/pdf
Sourcereponame:Repositório Institucional da Unicamp, instname:Universidade Estadual de Campinas, instacron:UNICAMP
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0021 seconds