Return to search

Val av byggproduktionsmetod/ Praktikfall Klammerdamm : Golvgips eller avjämningsmassa

This report is about how to decide which method is the most suitable as floor covering at project Klammerdamm in the centre of Halmstad. The covering has to be fire resistant and soundproof in order to protect the wood structure and stop noise from traveling between apartments. There are two possibilities either traditional gypsum board or gypsum-based self leveling underlayment. The roads around the construction site are narrow. A regular twenty-five meter long truck has no possibility to reach the site. The construction site is small and the storage area is limited. Good planning is one condition, among many others, that has to be fulfilled to make this project doable. All relevant parameters has been taken into account and analyzed with a decision model.

Identiferoai:union.ndltd.org:UPSALLA1/oai:DiVA.org:hh-935
Date January 2007
CreatorsStojnic Dragan, Lindblad Henrik
PublisherHögskolan i Halmstad, Sektionen för ekonomi och teknik (SET), Högskolan i Halmstad/Sektionen för Ekonomi och Teknik (SET)
Source SetsDiVA Archive at Upsalla University
LanguageSwedish
Detected LanguageEnglish
TypeStudent thesis, info:eu-repo/semantics/bachelorThesis, text
Formatapplication/pdf
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0152 seconds