Return to search

Modernisering av driv- och vändstation för timmersortering

The purpose of the rebuild of Notnäs AB timber sorting line is to renew the existing drive and turning ends of the transport chain, which has become old. This means that Notnäs AB have problems to get new parts if the gearbox and chain are worn out. They also require that the rebuild should have a maintenance schedule for the new spare parts that will be used in the rebuild. Maintenance workers placed great emphasis on that in a rebuild it shall be a service-friendly design. The maintenance schedule used in Notnäs AB in the current situation is from Statoil and the report uses SKF formulas and recommendations in order to obtain a lubricating schedule. The rebuild has been made in Pro Engineers skeletal structure with a top-down structure. Notnäs AB will have all the CAD files as well as complete drawings that make it possible for the rebuild to take place after the summer of 2010. After a summary of the CAD it revealed that a rebuild of timber sorting line was possible. Parts of the draw-ings are available in a reduced format of the report. Drawings have been approved and work on the rebuild can be started by Notnäs AB.The purpose of the rebuild of Notnäs AB timber sorting line is to renew the existing drive and turning ends of the transport chain, which has become old. This means that Notnäs AB have problems to get new parts if the gearbox and chain are worn out. They also require that the rebuild should have a maintenance schedule for the new spare parts that will be used in the rebuild. Maintenance workers placed great emphasis on that in a rebuild it shall be a service-friendly design. The maintenance schedule used in Notnäs AB in the current situation is from Statoil and the report uses SKF formulas and recommendations in order to obtain a lubricating schedule. The rebuild has been made in Pro Engineers skeletal structure with a top-down structure. Notnäs AB will have all the CAD files as well as complete drawings that make it possible for the rebuild to take place after the summer of 2010. After a summary of the CAD it revealed that a rebuild of timber sorting line was possible. Parts of the draw-ings are available in a reduced format of the report. Drawings have been approved and work on the rebuild can be started by Notnäs AB.

Identiferoai:union.ndltd.org:UPSALLA1/oai:DiVA.org:kau-5893
Date January 2010
CreatorsKihlgren, Erik, Masterdalshei, Jonas
PublisherKarlstads universitet, Institutionen för ingenjörsvetenskap, fysik och matematik, Karlstads universitet, Institutionen för ingenjörsvetenskap, fysik och matematik
Source SetsDiVA Archive at Upsalla University
LanguageSwedish
Detected LanguageEnglish
TypeStudent thesis, info:eu-repo/semantics/bachelorThesis, text
Formatapplication/pdf
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0064 seconds