Return to search

Study on Fault Restoration Strategy of Distribution Feeders and Main Transformers

The demand for electric load in recent years has been growing consistently in Taiwan. Besides supplying the load demand, the electricity service of distribution systems has to be reliable to meet the power quality of high tech industry. For a fault contingency in distribution systems, the fault location has to be identified and isolated by operating the boundary line switches. The electricity service for the un-faulted but outaged area has to be restored by transfering the loading to the neighboring feeders. The service reliability of distribution systems, a comprehensive distribution automation system DAS is implemented by integrating the computer master station, the communication system and the remote controlling equipments. The master station of DAS system to perform the function of fault detection, isolation and restoration (FDIR) can accelerate the process of service restoration for fault contingency.
To support the topology process of distribution system network, the outage management system (OMS), which has also been installed in all Taipower districts to store the attributes of distribution components, has been applied in this study. The operating mapping system is created to support distribution system operation by retrieving the static data from the OMS system and the dynamic data of line switch status from the real time database (RTDB). By this way, the distribution system network is updated by executing the network topology processor according to the operation of line switches.
In this thesis, a rule-based expert system is developed for fault restoration of distribution systems. To assure the proposed switch operation plan for fault restoration can comply with the distribution system operation regulation in Taipower, all of the feeders with open the switch to each feeder are formulated as a supporting group. The reserve capacity of each supporting feeders is used to compare the loading of unfaulted but outaged sections for downstream restoration. Based on the embeded rule base in the application program, the op line switch plan for fault restoration can therefore be derived for dispatchers engineers to restore the service in a short time period.
Besides the FDIR function, the application software can also be used to derive the optimal switching operation for loading balance of distribution feeders to enhance the operation efficiency of distribution systems.

Identiferoai:union.ndltd.org:NSYSU/oai:NSYSU:etd-0707107-162556
Date07 July 2007
CreatorsChen, I-Tsung
ContributorsHui-Jen Chuang, Chia-Hung Lin, Chao-Shun Chen, Jhao-Shiang Wu
PublisherNSYSU
Source SetsNSYSU Electronic Thesis and Dissertation Archive
LanguageCholon
Detected LanguageEnglish
Typetext
Formatapplication/pdf
Sourcehttp://etd.lib.nsysu.edu.tw/ETD-db/ETD-search/view_etd?URN=etd-0707107-162556
Rightscampus_withheld, Copyright information available at source archive

Page generated in 0.002 seconds