Orientador: Arnaldo Vieira Moura / Dissertação (mestrado) - Universidade Estadual de Campinas, Instituto de Computação / Made available in DSpace on 2018-08-06T15:19:37Z (GMT). No. of bitstreams: 1
Pereira_RomuloAlbuquerque_M.pdf: 1452483 bytes, checksum: 19f11b532a512f1e86efa79195a4e8ce (MD5)
Previous issue date: 2005 / Resumo: Este trabalho de mestrado procurou estudar e resolver um problema real de escalonamento das atividades de desenvolvimento de poços de petróleo em alto mar. Uma versão mais simples deste mesmo problema foi provada ser NP- difícil. Nosso estudo se concentrou no problema real enfrentado pela Petrobrás, com todas suas características e nuances. Antes que locais promissores de bacias petrolíferas sejam efetivamente desenvolvidos em poços de petróleo produtivos, é necessário realizar diversas atividades de perfuração, completarão e interligação nesses locais. O escalonamento dessas atividades deve satisfazer várias restrições conflitantes e buscar a maximização da produção de petróleo em um dado horizonte de tempo. O problema foi atacado em duas etapas: uma sem considerar o deslocamento de recursos e outra considerando-os. Para tal, adotamos a estratégia Greedy Randomized Adaptive Search Procedure (GRASP) e incorporamos várias técnicas específicas para obter melhor desempenho e qualidade da solução final. Os resultados são comparados com outros produzidos por uma ferramenta computacional baseada em Programação por Restrições (PR). Esta última, já em uso e bem aceita na empresa, foi desenvolvida pela Petrobrás. Resultados comparativos realizados em instâncias reais indicam que a implementação GRASP supera a ferramenta de PR produzindo soluções com expressivos aumentos de produção / Abstract: This dissertation aimed at studying and solving a real world scheduling problem. We deal with the scheduling of offshore oil well development activities. A simpler version of this same problem was proved to be in NP-hard. Our approach treats this problem as faced by Petrobras, with all its characteristics and details. Before promising locations at petroliferous basins become productive oil wells, it is often necessary to complete activities of drilling, completion and interconnection at these locations. The scheduling of such activities must satisfy several conflicting constraints and aim at the maximization of oil production. The problem was solved in two parts: one without considering resource displacements and other taking into account such displacements. For such, we used a Greedy Randomized Adaptive Search Procedure (GRASP) metaheuristic and used several techniques and variants in order to obtain more efficiency and produce better solutions. The results are compared with schedules produced by a well-accepted constraint programming implementation. Computational experience on real instances indicates that the GRASP implementation is competitive, outperforming the constraint programming implementation / Mestrado / Otimização Combinatoria / Mestre em Ciência da Computação
Identifer | oai:union.ndltd.org:IBICT/oai:repositorio.unicamp.br:REPOSIP/276506 |
Date | 16 December 2005 |
Creators | Pereira, Romulo Albuquerque |
Contributors | UNIVERSIDADE ESTADUAL DE CAMPINAS, Moura, Arnaldo Vieira, 1950-, Dahab, Ricardo, Amaral, Vinivius, Meidanis, João |
Publisher | [s.n.], Universidade Estadual de Campinas. Instituto de Computação |
Source Sets | IBICT Brazilian ETDs |
Language | Portuguese |
Detected Language | Portuguese |
Type | info:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis |
Format | 92p. : il., application/octet-stream |
Source | reponame:Repositório Institucional da Unicamp, instname:Universidade Estadual de Campinas, instacron:UNICAMP |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.0016 seconds