This report is about planning a demolition. The purpose of this report is that it should become a base for a demolition of house J at the Academic hospital in Uppsala, and also to make general help for planning a demolition. This report also contains a part about how a change in the work environment affects general people. The work started with studies of literature and design of the general part of the report and then continued with a practical study of house J. From the experience of the first two parts of the report a general help for planning a demolition was shaped. Today in the demolition industry the most common and effective way to demolish a building is to do it selective and that means, taking the building down part by part depending on the grade of separation. The recommendation for the demolition of house J is to do it selective. “Thinking” about the demolition in the building phase of a house helps to reduce the environmental effects of the demolition and makes it easier to carry out. Planning a building should be done in a long term perspective to make it easier to cope with activity changes, rebuilding and complementary building. When a building is due for demolition it’s important to know everything about the construction of the building and it’s materials to make a good demolition plan both economic and environmental.
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:mdh-629 |
Date | January 2008 |
Creators | Hermansson, Per, Isacson, Johan |
Publisher | Mälardalens högskola, Akademin för hållbar samhälls- och teknikutveckling, Mälardalens högskola, Akademin för hållbar samhälls- och teknikutveckling, Akademin för hållbar samhälls- och teknikutveckling |
Source Sets | DiVA Archive at Upsalla University |
Language | Swedish |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.0022 seconds