Submitted by Nadir Basilio (nadirsb@uninove.br) on 2018-04-03T18:35:34Z
No. of bitstreams: 1
Rosana Yasue Narazaki.pdf: 6250505 bytes, checksum: 6740b17cf0ae92f594c884443f115a11 (MD5) / Made available in DSpace on 2018-04-03T18:35:34Z (GMT). No. of bitstreams: 1
Rosana Yasue Narazaki.pdf: 6250505 bytes, checksum: 6740b17cf0ae92f594c884443f115a11 (MD5)
Previous issue date: 2017-12-14 / A gestão do conhecimento (GC) é essencial para manter e desenvolver o conhecimento como ativo da organização. A equipe de projeto está se tornando mais descentralizada, exigindo tecnologia para suportar a GC nas atividades de gerenciamento de projetos (GP). A premissa para o fluxo do conhecimento acontecer é ter um ‘ba’ (espaço compartilhado) e este deve ser apoiado por um conjunto de ferramentas colaborativas, como as mídias sociais (MS). No entanto, as melhores práticas em GP não lidam com a dinâmica da GC de forma explícita, o que tem causado falta de rastreabilidade e perda de conhecimento explícito e tácito durante o ciclo de vida do projeto. Além disso, os indivíduos desejam facilidade de uso e acessibilidade, contudo não querem mais uma ferramenta para gerenciar, sugerindo que as MS devam ser integradas. Nesse propósito, o presente estudo analisou uma solução por meio de um instrumento técnico, sob a abordagem Design Science Research (DSR), com a intenção de responder à questão de pesquisa: Como o uso integrado das mídias sociais suportam à GC nas atividades relacionadas ao GP em um projeto de uma instituição de segurança pública? O artefato SM4PM (Social Media for Project Management), um framework prescritivo que guia o uso integrado de mídias sociais para apoiar atividades relacionadas ao GP, foi instanciado para avaliar GC no GP em um projeto de uma instituição de segurança pública. A coleta de dados foi feita por meio de quatro técnicas: 1) Entrevistas, 2) Observação direta, 3) Análise documental e 4) Grupo focal. Estes dados foram analisados em cinco etapas com o suporte do software de análise qualitativa MaxQdaPlus: 1) Compilação, 2) Decomposição, 3) Recomposição, 4) Interpretação e 5) Conclusão. Os resultados mostram que as MS suportam a GC em atividades relacionadas ao GP, dando uma forte evidência de que o framework SM4PM pode ser generalizado para resolver uma classe de problema, tais como coletar lições aprendidas naturalmente durante o ciclo de vida do projeto, gerenciar o conhecimento no gerenciamento de projetos, entender o relacionamento entre os processos e a sua integração. Como contribuição, o estudo aplicou empiricamente a ‘teoria para prática’ pela instanciação de um instrumento técnico baseado na “teoria de fazer bem’ e aplicou a ‘teoria que vem da prática’ para refinar este instrumento técnico. O uso do framework SM4PM pode beneficiar os gerentes de projeto, os membros da equipe e as partes interessadas no projeto. / Knowledge management (KM) is essential for keeping and developing knowledge as an asset of organizations. Project team is becoming more decentralized, requiring technology to support KM in project management (PM) activities. The premise to the flux of knowledge to happen is to have a ‘ba’ (shared space) and this should be supported by a set of collaborative tools, such as social media (SM). Nevertheless, best practices in PM do not deal with the KM dynamics explicitly which has caused lack of traceability and loss of explicit and tacit knowledge during the project lifecycle. In addition, individuals desire ease of use and accessibility and yet no longer want a tool to manage, suggesting that SM should be integrated. For this purpose, this research analyzed a solution by a technical instrument, under Design Science Research approach, with the intention of answering the research question: How does the integrated use of SM support KM in activities related to PM in a project of a public security organization? The SM4PM (Social Media for Project Management), a prescriptive framework for guiding integrated use of SM in PM, was instantiated to evaluate KM in PM in a project of public security organization. Data collection was done through four techniques: 1) Interviews, 2) Direct observations, 3) Document analysis and 4) Focus group. These data were analyzed in five stages with the support of the MaxQdaPlus qualitative analysis software: 1) Compilation, 2) Decomposition, 3) Recomposition, 4) Interpretation and 5) Conclusion. Results showed that SM support KM in activities related to PM giving strong evidence that SM4PM framework can be generalized to solve a class of problems, such as collecting lessons learned naturally during the project lifecycle, managing the knowledge in PM, understanding relationship among processes and their integration. As a contribution, the study empirically applied ‘theory to practice’ by instantiating a technical instrument based on ‘theory of doing well’ and applied ‘theory from practice’ to refine this technical instrument. The use of SM4PM framework can benefit project managers, team members and project stakeholders.
Identifer | oai:union.ndltd.org:IBICT/oai:localhost:tede/1746 |
Date | 14 December 2017 |
Creators | Narazaki, Rosana Yasue |
Contributors | Pedron, Cristiane Drebes, Pedron, Cristiane Drebes, Chaves, Marcirio Silveira, Russo, Rosaria de Fatima Segger Macri, Popadiuk, Silvio |
Publisher | Universidade Nove de Julho, Programa de Mestrado Profissional em Administração - Gestão de Projetos, UNINOVE, Brasil, Administração |
Source Sets | IBICT Brazilian ETDs |
Language | Portuguese |
Detected Language | English |
Type | info:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis |
Format | application/pdf |
Source | reponame:Biblioteca Digital de Teses e Dissertações da Uninove, instname:Universidade Nove de Julho, instacron:UNINOVE |
Rights | info:eu-repo/semantics/openAccess |
Relation | 8024035432632778221, 600 |
Page generated in 0.003 seconds