Return to search

CAE of Gas Turbine Combustor Chamber : Improving workflow in product lifecycle management systems

This thesis seeks to improve the workflow in the product development process when using the Product Lifecycle Management (PLM) system PLM2020, incorporated at Siemens Energy. Focus is on three problem cases that emerge when working with Computer Aided Engineering (CAE) data during the development process. Apart from solving these problems, a current situation analysis was conducted, and possible solutions of these problems were investigated on how they affect the lead time in the product development process. The problems consist of exploration of an unused function and solving of two problematic situations that can occur while using PLM2020 during development work. A case study was established to investigate the problems, using participatory observations and interviews. The interviews established the current situation of Siemens work methodology to handle these situations and how PLM2020 is used. During the observations, the problems were attempted to be solved using an arbitrary Computer Aided Design (CAD) model while exploring different functions in a sandbox environment. During the interviews, it was discovered that there exist different ways of working in PLM2020 and that some approaches nullifies the benefits of using a PLM system. The participatory observations revealed that that there exist functions in the PLM system that solves the problems encountered. A set of proposed solutions are presented to Siemens

Identiferoai:union.ndltd.org:UPSALLA1/oai:DiVA.org:liu-168687
Date January 2020
CreatorsSöderberg, Jakob
PublisherLinköpings universitet, Maskinkonstruktion
Source SetsDiVA Archive at Upsalla University
LanguageEnglish
Detected LanguageEnglish
TypeStudent thesis, info:eu-repo/semantics/bachelorThesis, text
Formatapplication/pdf
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0019 seconds