Return to search

Análise do comportamento de juntas de CCR com alto teor de finos / Behavior of RCC joints with high powder content

A tecnologia do concreto compactado com rolo tem se desenvolvido e transformado o cenário das construções de barragens, modernizando os conceitos sobre os processos construtivos, além de se mostrar uma técnica competitiva em comparação com os métodos já consagrados de construção de Barragens de terra, enrocamento e enrocamento com face de concreto. Até a década de 70 era usual o lançamento de um elemento de ligação entre camadas de concreto. Nesta época, estudos realizados pelo U.S. Bureau of Reclamation e U.S. Army Corps of Engineers mostraram que a sua utilização era desnecessária, desde que as juntas fossem cuidadosa e adequadamente preparadas. A construção da barragem de Willow Creek, com CCR sem nenhuma especificação de um elemento de ligação entre as camadas de concretagem, acabou resultando num alto nível de percolação de água. Devido a este fato, os grandes projetistas de estruturas hidráulicas e de barragens passaram a adotar um concreto de berço, lançado entre as camadas de CCR, abrangendo entre 30 % da seção superficial da junta, a partir do paramento de montante, até toda a camada. Neste projeto de pesquisa foi proposta a execução de maciços experimentais em laboratório, os quais simulam uma pequena fatia de uma barragem de CCR. Para simular o lançamento e adensamento do concreto destes maciços utilizou-se um equipamento existente no Laboratório de Concreto de FURNAS Centrais Elétricas S.A., localizado em Goiânia-GO. Foram confeccionados 11 maciços experimentais, nos quais foram realizadas avaliações referentes ao intervalo de lançamento entre camadas de concreto compactado com rolo, variando-se o tempo de exposição, a temperatura ambiente de lançamento, o tipo de tratamento da junta e a utilização de argamassa de ligação, ou seja, procurou-se avaliar o grau de maturidade das juntas, a partir do qual são necessárias providências para promover uma adequada aderência entre camadas e mostrar a importância da confecção prévia de maciços experimentais em laboratório para auxiliar a tomada de decisão durante a elaboração do projeto. / The roller compacted concrete technology has been increasable developed and, consequently, modified the dam constructions procedures, leading to improved concepts about the construction processes, besides presenting technical competitively when compared to earth, rockfill and concrete faced rockfill gravity dams construction methodology. The use of a bonding element (concrete or mortar), between concrete layers was common in the 70´s. At that time, studies conducted by the U.S. Bureau of Reclamation and the U.S. Army Corps of Engineers showed that this technique was unnecessary in traditional dam constructions for the cases of well and strictly prepared joints. The Willow Creek dam construction, using RCC without any specification about bonding element between layers, presented a high level of percolation. Since that, great hydraulic structures designers adopted a bed of small aggregate concrete, placed between RCC layers in about 30% of the superficial section of joint from the upstream face. To the herein research it was proposed the execution of experimental laboratory bulks simulating a small part of a RCC dam. For the simulation of placing and compaction of concrete it was used the equipment owned by FURNAS CENTRAIS ELETRICAS S.A., at the laboratory of Goiania, Brazil. Eleven experimental bulks were produced, in which were assessed the exposure of RCC layers in different time delays and temperatures, varying the layer concrete surface treatment and the use of mortar between layers in order to evaluate the maturity degree of joints and to define the procedures to a suitable bonding between layers. The studies show the importance of laboratory test fills during the design phases, as useful tools to help the technical decision processes.

Identiferoai:union.ndltd.org:IBICT/oai:lume.ufrgs.br:10183/14710
Date January 2007
CreatorsTraboulsi, Maurice Antoine
ContributorsDal Molin, Denise Carpena Coitinho, Marques Filho, José
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguagePortuguese
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Formatapplication/pdf
Sourcereponame:Biblioteca Digital de Teses e Dissertações da UFRGS, instname:Universidade Federal do Rio Grande do Sul, instacron:UFRGS
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0019 seconds