Yes / Governments in Australia place great emphasis on the development and expansion of their rail networks to improve productivity and service the increasing needs and demands from businesses and commuters. A case study approach is used to analyze the cost performance of 16 rail projects constructed by a contractor between 2011 and 2014, which ranged from AU$3.4 to AU$353 million. Findings indicate that scope changes during construction were the key contributors that lead to the amendment of each project’s original contractual value. As a result, there is a need for public and private sector asset owners to establish a cost contingency using a probabilistic rather than a deterministic approach to accommodate the potential for scope changes during construction. To improve cost certainty during the construction of rail projects, it is suggested that use of collaborative forms of procurement juxtaposed with the use of Building Information Modelling and Systems Information Modelling are implemented. The utilization of such technological and process innovations can provide public and private sector asset owners charged with delivering and maintaining their rail networks with confidence projects can be delivered within budget and are resilient to unexpected events and adaptable to changing needs, uses or capacities. / The authors would like to acknowledge the financial support provided by the Australian Research Council (DP160102882).
Identifer | oai:union.ndltd.org:BRADFORD/oai:bradscholars.brad.ac.uk:10454/11645 |
Date | 2017 March 1914 |
Creators | Love, P.E.D., Zhou, J., Edwards, D.J., Irani, Zahir, Sing, C-P. |
Source Sets | Bradford Scholars |
Language | English |
Detected Language | English |
Type | Article, Accepted manuscript |
Rights | © 2017 Elsevier. Reproduced in accordance with the publisher's self-archiving policy. This manuscript version is made available under the CC-BY-NC-ND 4.0 license http://creativecommons.org/licenses/by-nc-nd/4.0/ |
Page generated in 0.0018 seconds