Return to search

Ställtidsreducering : Med hjälp av SMED

The purpose of this project was to reduce setup time on a press machine at Nitator Hylte AB and to develop a Standard Operating Procedure (SOP), which will serve as a basis for the operators to carry out the work. When the company was contacted so considered site manager that the current change over time was far from optimal and had the desire that it would be reduced by 50%. In connection with the project they were made some boundaries to make the project possible. The methodology that the authors have followed was Shigeo Shingo theory, Single Minute Exchange of Die (SMED), which assumes that it will change the routine during transitions by making as much preparation work as possible, this is done by analyzes based on observation from observations, videotaping and timings. The resistance that can occur when trying to reduce setup time is the human aspect, this type of resistors most often occurs in the lack of education and lack of good communication. The results from the project led to a new routine for how the work should be executed during the changeover. During the project diffrent kind of technical solutions was created to simplify the work during the changeover. At the end of the project the aouthers conducted a pilottest to determinate how much time that had been reduced. The Results from the test showed that 50 % of the time had been reduced.

Identiferoai:union.ndltd.org:UPSALLA1/oai:DiVA.org:hh-31170
Date January 2016
CreatorsBratt, Linus, Gilbert, Charles
PublisherHögskolan i Halmstad, Akademin för ekonomi, teknik och naturvetenskap, Högskolan i Halmstad, Akademin för ekonomi, teknik och naturvetenskap
Source SetsDiVA Archive at Upsalla University
LanguageSwedish
Detected LanguageEnglish
TypeStudent thesis, info:eu-repo/semantics/bachelorThesis, text
Formatapplication/pdf
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0022 seconds