Return to search

High performance vibration isolation techniques for the AIGO gravitational wave detector

[Truncated abstract] Interferometric gravitational wave detectors are being built around the world with continually improving measurement sensitivities. Noise levels from sources that are intrinsic to these detectors must be reduced to a level below the gravita- tional wave signal. Seismic noise in the low frequency range, which is within the gravitational wave detection bandwidth, is a concern for earth-based detectors. This thesis presents research and development of a high performance vibration isolation system that is designed to attenuate seismic noise. The final design will be used as part of a fully working interferometer at the Australian International Gravitational Observatory (AIGO). Pendulums and springs are conventionally used for the horizontal and vertical vibration isolation components respectively. A complete system comprises of a cascade of these components, each stage dramatically improving the level of isola- tion. The residual motion at the test mass level is thus reduced but is dominated by the normal mode resonances of the chain. A simple and effective method to reduce residual motion further is to add ultra-low frequency pre-isolation stages which suspend the chain. The Roberts Linkage is a relatively new and simple geometrical structure that is implemented in the pre-isolation stages. Here we present experimental results of improving isolation based on mathematical mod- elling. The attenuation of seismic noise in the vertical direction is almost as important as that in the horizontal direction, due to cross-coupling between the two planes. To help improve the vertical performance a lightweight Euler spring that stores no static energy was implemented into the AIGO suspension system. ... Theoretical and experimental results are presented and discussed. Currently the AIGO laboratory consists of two 80 m length arms. They are aligned along the east and south directions. One of AIGO's top priorities is the installation of two complete vibration isolators in the east arm to form a Fabry-Perot cavity. Assembling two suspension systems will enable more accurate performance measurements of the tuned isolators. This would significantly reduce the measurement noise floor as well as eliminate the seismic noise spectrum due to referencing with the ground motion. The processes involved in preparing such a task is presented, including clean room preparation, tuning of each isolator stage, and local control schematics and methods. The status of the AIGO site is also presented.

Identiferoai:union.ndltd.org:ADTP/221424
Date January 2007
CreatorsChin, Eu-Jeen
PublisherUniversity of Western Australia. School of Physics
Source SetsAustraliasian Digital Theses Program
LanguageEnglish
Detected LanguageEnglish
RightsCopyright Eu-Jeen Chin, http://www.itpo.uwa.edu.au/UWA-Computer-And-Software-Use-Regulations.html

Page generated in 0.0017 seconds